07.09.2014 Views

2002 Swinburne TAFE Handbook - Swinburne University of ...

2002 Swinburne TAFE Handbook - Swinburne University of ...

2002 Swinburne TAFE Handbook - Swinburne University of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

166 I Subject Details<br />

Aims & Objectives<br />

Competency is demonstrated by removing furniture from a nominated door and a<br />

nominated windowforthe purpose <strong>of</strong> painting and replacing and refitting doors/shutters<br />

where applicable.<br />

BCG2012A Make Out Sets<br />

• Prerequisite: Nil<br />

Aims & Objectives<br />

Competency is demonstrated by making a set out complete and accurate in detail, from<br />

which parts/components <strong>of</strong> a unit can be produced and marked.<br />

BCG3009A Construct and Install Non-load<br />

Bearing Internal Partition Wall<br />

16 nominal Hours· Prerequisite: BGGI 016A, BGG2000A<br />

Aims & Objectives<br />

Competency is to be demonstrated by the performance <strong>of</strong> setting out, constructing and<br />

installing a partition wall to a design.<br />

BCG3010A Install Windows to Wall framing<br />

12 nominal Hours· Prerequisite: BGGI 005A, BGG100BA, BGG2004A • Assessment:<br />

Gompetency is to be demonstrated by the performance <strong>of</strong> installing both a timber<br />

window frame and an aluminium window frame to a framed wall. In one situation the<br />

wall frame is to be <strong>of</strong> timber and the other <strong>of</strong> metal.<br />

BCG3011A Carry Out Basic Setting Out<br />

12 nominal Hours· Prerequisite: BGG1003A, BGG1015A, BGG2004<br />

Aims & Objectives<br />

Competency is to be demonstrated by the performance <strong>of</strong> setting out and establishing<br />

hurdles/pr<strong>of</strong>iles and building lines for a nominated 'L shaped building on a building block.<br />

BCG3012A Construct and ErectTimber Wall<br />

framing<br />

40 nominal Hours. Prerequisite: BGG1002A, BGGI 003A, BGG1005A, BGG1006A,<br />

BGG100BA, BGG1016A, BGG2000A<br />

Aims & Objectives<br />

Competency is to be demonstrated by the performance <strong>of</strong> setting out, constructing and<br />

erecting walls for a nominated building involving door and window openings and at least<br />

one internal wall.<br />

BCG3013A Erect Ceiling framing (Pitched<br />

Ro<strong>of</strong>)<br />

• Prerequisite: BGG1016A, BGG3012A<br />

Aims & Objectives<br />

Competency isto be demonstrated by the performance <strong>of</strong> setting out and installing<br />

ceiling framing for a nominated projectto involve a hip and valley ro<strong>of</strong>.<br />

BCG3014A ErectTimber Pitched Ro<strong>of</strong> framing<br />

40 nominal Hours· Prerequisite: BGGI 016A, BGG3012A, BGG3013A<br />

Aims & Objectives<br />

Competency is to be demonstrated by the performance <strong>of</strong> setting out, cutting and<br />

erecting a pitched ro<strong>of</strong>for a nominated ro<strong>of</strong> structure incorporating hips, valleys and a<br />

gable end.<br />

BCG3016A Install Sub-Floor Framing<br />

24 nominal Hours· Prerequisite: GGI 003A, BGGI 005A, BGG100BA, BGG10llA<br />

Aims & Objectives<br />

Competency is to be demonstrated by the performance <strong>of</strong> installing bearers and joists<br />

or ladderframes for sub-floorframing to a nominated building project.<br />

BCG3017A Install Timber and Sheet Flooring<br />

B nominal Hours· Prerequisite: BGGI003A, BGG1004A, BGGI005A, BGGI006A,<br />

BGG1016A, BGG3016A<br />

Aims & Objectives<br />

Competency is demonstrated by the performance <strong>of</strong> installing two separate floors to<br />

nominated areas, one <strong>of</strong> tongued and grooved flooring boards and the other <strong>of</strong> sheet<br />

flooring.<br />

BCG3018A Erect Steel Ro<strong>of</strong> Trusses<br />

24 nominal Hours· Prerequisite: BGG1006A, BGG2006A, BGG3019A<br />

Aims & Objectives<br />

Competency isto be demonstrated by the performance <strong>of</strong> erecting and installing a steel<br />

ro<strong>of</strong>truss structure to a nominated ro<strong>of</strong> plan.<br />

BCG3019A Construct and Erect Steel Wall<br />

Framing<br />

40 nominal Hours· Prerequisite: BGGI 006A, BGG2006A<br />

Aims & Objectives<br />

Competency is to be demonstrated by the performance <strong>of</strong> erecting a steel wall framing<br />

for a nominated building involving door and window openings.<br />

BCG3020A Construct Timber Ro<strong>of</strong> Structures -<br />

Irregular Ro<strong>of</strong>s<br />

40 nominal Hours· Prerequisite: BGG3012A, BGG3015A<br />

Aims & Objectives<br />

Competency is to be demonstrated by the performance <strong>of</strong> erecting an irregular ro<strong>of</strong><br />

structure to a nominated ro<strong>of</strong> plan.<br />

BCG3021A Install Door Frames<br />

8 nominal Hours· Prerequisite: BGGI 002A, BGGI 005A, BGGI OOM BGGI 016A,<br />

BGG2004A<br />

Aims & Objectives<br />

Competency is demonstrated by the performance <strong>of</strong> installing a door frame to a<br />

nominated project <strong>of</strong> a structure.<br />

BCG3022A Finish Eaves<br />

12 nominal Hours· Prerequisite: BGG1005A, BGG1001A, BGG1016A, BGG2004A<br />

Aims & Objectives<br />

Competency is to be demonstrated by the performance <strong>of</strong> constructing and finishing at<br />

least two separate eaves designs .<br />

BCG3023A Install Exterior Cladding<br />

36 nominal Hours· Prerequisite: BGGI 001 A, BGGI 016A, BGG3021A, BGG301 OA<br />

Aims & Objectives<br />

Competency is demonstrated by the performance <strong>of</strong> installing at least two types <strong>of</strong><br />

material finishes to nominated external wall surfaces. One isto be <strong>of</strong> horizontal boards<br />

and the other <strong>of</strong> sheeted material.<br />

BCG3024A ConstructTimber External Stairs<br />

36 nominal Hours· Prerequisite: BGGI 003A, BGGI 016A, BGG3016A<br />

Aims & Objectives<br />

Competency is to be demonstrated by the safe and effective assembly and erection <strong>of</strong><br />

timber external stairs covering one flight and a landing, including handrail or balustrade.<br />

BCG3025A Install External or Internal Doors<br />

40 nominal Hours· Prerequisite: BGGI 005A, BGG1008A, BGG2004A<br />

<strong>Swinburne</strong> <strong>University</strong> <strong>of</strong> Technology I <strong>TAFE</strong> <strong>Handbook</strong> <strong>2002</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!