MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

Document6<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE MAINLINE CONSTRUCTION<br />

(ONSHORE)<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 6 OF 53<br />

MEC/S/05/62/01 REVISION A<br />

3.1.1.4 DURING THUNDERSTORMS OR WHEN DISCHARGES ARE<br />

OBSERVED ON INSULATORS ALL PERSONNEL MUST LEAVE THE AREA<br />

OF THE HIGH VOLTAGE LINE AND PIPELINE.<br />

3.1.1.5 To prevent electrical voltage in a non-buried section <strong>of</strong> the pipeline from<br />

rising to dangerous levels, the length <strong>of</strong> the pipeline section which has been<br />

welded together before burial must not exceed the length at which the max.<br />

admissible voltage may be induced. This length may be calculated using an<br />

approved calculation method.<br />

3.1.1.6 Before a pipeline section is lowered into the trench the structure's earth<br />

electrodes indicated in the drawings or determined with calculation method must<br />

have been installed and connected both to the pipeline section already buried<br />

and to the section which is about to be buried. The electrical connections which<br />

serve the purpose <strong>of</strong> preventing dangerous voltages must have a min. area <strong>of</strong><br />

35mm 2.<br />

Said connections must not be interrupted until after the permanent safety earth<br />

connections have been installed and connected to the entire uninterrupted<br />

pipeline.<br />

3.1.1.7 The welded connection between the pipeline section and the section<br />

already buried must be installed at a distance <strong>of</strong> at least 50m from the nearest<br />

point <strong>of</strong> a pylon base.<br />

3.1.1.8 Personnel doing work inside the area <strong>of</strong> influence <strong>of</strong> the high voltage<br />

system must wear electrically insulating foot-wear (e.g. rubber kneeboots) and<br />

wear insulating rubber or plastic gloves.<br />

3.1.2 Additional measures for work at less than 50m from the centre <strong>of</strong> the high<br />

voltage system.<br />

If work is done at less than 50m from the centre <strong>of</strong> the high voltage system, the<br />

regulations below must be complied with in addition to the rules specified in<br />

clause 3.1.1.<br />

3.1.2.1 The work must not be started until agreement has been reached with the<br />

authorities which controls the high voltage system, about the implementation <strong>of</strong><br />

the safety measures specified in this section.