- Page 1 and 2:
GAIL (India) Limited TENDER DOCUMEN
- Page 3 and 4:
D:\old data\FATEH\IDPL_Dholpur\SCC\
- Page 5 and 6:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 7 and 8:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 9 and 10:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 11 and 12:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 13 and 14:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 15 and 16:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 17 and 18:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 19 and 20:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 21 and 22:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 23 and 24:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 25 and 26:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 27 and 28:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 29 and 30:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 31 and 32:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 33 and 34:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 35 and 36:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 37 and 38:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 39 and 40:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 41 and 42:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 43 and 44:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 45 and 46:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 47 and 48:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 49 and 50:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 51 and 52:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 53 and 54:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 55 and 56:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 57:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 61 and 62:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 63 and 64:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 65 and 66:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 67 and 68:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 69 and 70:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 71 and 72:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 73 and 74:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 75 and 76:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 77 and 78:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 79 and 80:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 81 and 82:
Pipe Size, Out Side Diamter- Inches
- Page 83 and 84:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 85 and 86:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 87 and 88:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 89 and 90:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 91 and 92: MECON LIMITED REGD. OFF : RANCHI (B
- Page 93 and 94: MECON LIMITED REGD. OFF : RANCHI (B
- Page 95 and 96: \\Akjha\work contrac\standard TS fo
- Page 97 and 98: MECON LIMITED REGD. OFF : RANCHI (B
- Page 99 and 100: MECON LIMITED REGD. OFF : RANCHI (B
- Page 101 and 102: MECON LIMITED REGD. OFF : RANCHI (B
- Page 103 and 104: MECON LIMITED REGD. OFF : RANCHI (B
- Page 105 and 106: MECON LIMITED REGD. OFF : RANCHI (B
- Page 107 and 108: MECON LIMITED REGD. OFF : RANCHI (B
- Page 109 and 110: MECON LIMITED REGD. OFF : RANCHI (B
- Page 111: MECON LIMITED REGD. OFF : RANCHI (B
- Page 120 and 121: SPECIFICATION FOR HYDROSTATIC TESTI
- Page 122 and 123: MECON LIMITED REGD. OFF : RANCHI (B
- Page 124 and 125: MECON LIMITED REGD. OFF : RANCHI (B
- Page 126 and 127: c:\fateh\standard\stad-eqp.wp NEW D
- Page 128 and 129: MECON LIMITED REGD. OFF : RANCHI (B
- Page 130 and 131: MECON LIMITED REGD. OFF : RANCHI (B
- Page 132 and 133: MECON LIMITED REGD. OFF : RANCHI (B
- Page 134 and 135: MECON LIMITED REGD. OFF : RANCHI (B
- Page 136 and 137: MECON LIMITED REGD. OFF : RANCHI (B
- Page 138 and 139: 0 C C; \ts\Tender-A,4.doc. TABLE -
- Page 140 and 141: 0 C C; \ts\Tender-A,4.doc. TABLE -
- Page 144 and 145: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 146 and 147: MECON LIMITED REGD. OFF : RANCHI (B
- Page 148 and 149: MECON LIMITED REGD. OFF : RANCHI (B
- Page 150 and 151: MECON LIMITED REGD. OFF : RANCHI (B
- Page 152 and 153: MECON LIMITED REGD. OFF : RANCHI (B
- Page 154 and 155: MECON LIMITED REGD. OFF : RANCHI (B
- Page 156 and 157: MECON LIMITED REGD. OFF : RANCHI (B
- Page 158 and 159: SPECIFICATION FOR PIPELINES CROSSIN
- Page 160 and 161: MECON LIMITED REGD. OFF : RANCHI (B
- Page 162 and 163: MECON LIMITED REGD. OFF : RANCHI (B
- Page 164 and 165: MECON LIMITED REGD. OFF : RANCHI (B
- Page 166 and 167: MECON LIMITED REGD. OFF : RANCHI (B
- Page 168: MECON LIMITED REGD. OFF : RANCHI (B
- Page 177 and 178: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 179 and 180: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 181 and 182: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 183 and 184: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 185 and 186: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 187 and 188: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 189 and 190: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 191 and 192: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 193 and 194:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 195 and 196:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 197 and 198:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 199 and 200:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 201 and 202:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 203 and 204:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 205 and 206:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 207 and 208:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 209 and 210:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 211 and 212:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 213 and 214:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 215 and 216:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 217 and 218:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 219 and 220:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 221 and 222:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 223 and 224:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 225 and 226:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 227 and 228:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 229 and 230:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 231 and 232:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 233 and 234:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 235 and 236:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 237 and 238:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 277 and 278:
SPECIFICATION FOR SHOP & FIELD PAIN
- Page 279 and 280:
Sl. Description Page No. No. 19.0 I
- Page 281 and 282:
f. Identification colour bands on a
- Page 283 and 284:
3.2.5 Various International Standar
- Page 285 and 286:
The blasting nozzles should be vent
- Page 287 and 288:
5.7.1 Surface shall not be coated i
- Page 289 and 290:
atomization to produce the desired
- Page 291 and 292:
- One coat of F-9 shall be applied
- Page 293 and 294:
Page 14 of 49
- Page 295 and 296:
S. NO. DESCRIPTION 3.3 COMMERCIAL B
- Page 297 and 298:
PAINT MATERIALS TABLE NO.: 6.1 PRIM
- Page 299 and 300:
PAINT MATERIALS TABLE NO.: 6.3 FINI
- Page 301 and 302:
F-7 : High Build Coal Tar epoxy coa
- Page 303 and 304:
TABLE 8.0: FIELD PAINT SYSTEM FOR N
- Page 305 and 306:
TABLE 9.0: FIELD PAINT SYSTEM FOR C
- Page 307 and 308:
TABLE 11.0 : FIELD PAINT SYSTEM FOR
- Page 309 and 310:
TABLE 13.0 : COATING SYSTEM FOR EXT
- Page 312 and 313:
TABLE 15.0 : INTERNAL PROTECTION OF
- Page 314 and 315:
SR. NO. DESCRIPTION GROUND COLOUR F
- Page 316 and 317:
of black and golden yellow as epr I
- Page 318 and 319:
In addition to above, record should
- Page 320 and 321:
24.0 PROCEDURE FOR APPROVAL OF NEW
- Page 322 and 323:
Indian Vendors LIST OF RECOMMENDED
- Page 324 and 325:
LIST OF RECOMMENDED MANUFACTURER’
- Page 326 and 327:
LIST OF RECOMMENDED MANUFACTURER’
- Page 328 and 329:
LIST OF RECOMMENDED MANUFACTURER’
- Page 330 and 331:
MECON LIMITED DELHI PROCESS & PIPIN
- Page 332 and 333:
MECON LIMITED DELHI PROCESS & PIPIN
- Page 334 and 335:
1.0 SCOPE 2.0 RECORDS C O N T E N T
- Page 336 and 337:
• Accidents • Damages 2.2 Weekl
- Page 338 and 339:
• Drawings issued by Contractor.
- Page 340 and 341:
If required by the Company, Contrac
- Page 342 and 343:
- Wall thickness - Pipe number - He
- Page 344 and 345:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 346 and 347:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 354 and 355:
SPECIFICATION FOR FLUSHING AND TEST
- Page 356 and 357:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 358 and 359:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 360 and 361:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 362 and 363:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 364 and 365:
Document3 SPECIFICATION FOR CASING
- Page 366 and 367:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 368 and 369:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 370 and 371:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 377 and 378:
c:\fateh\standard\gas-b&n.wp SPECIF
- Page 379 and 380:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 381 and 382:
PIPING MATERIAL SPECIFICATION SPECI
- Page 383 and 384:
1.0 SCOPE This specification covers
- Page 385 and 386:
7.7 Integrally reinforced forged br
- Page 387 and 388:
MAIN LINE PIPE MATERIAL Line Pipe M
- Page 395 and 396:
D:\old data\FATEH\Aban Power\TS\Spe
- Page 397 and 398:
1.0 SCOPE This specification covers
- Page 399 and 400:
The heat shrink wraparound sleeve s
- Page 401 and 402:
3.5 Materials shall be stored in sh
- Page 403 and 404:
4.2.1 The wrap around sleeve shall
- Page 405 and 406:
5.0 INSPECTION & TESTING 5.1 Visual
- Page 407 and 408:
- Stop field coating until remedial
- Page 409 and 410:
1.0 SCOPE 2.0 REFERENCE DOCUMENTS C
- Page 411 and 412:
k. ASTM D-2240 : Test Method for Ru
- Page 413 and 414:
4.0 MATERIALS 4.1 The three layer c
- Page 415 and 416:
5.3.1 Properties of Epoxy Powder an
- Page 417 and 418:
pipes as applicable. CONTRACTOR sha
- Page 419 and 420:
shall be coated partly with epoxy a
- Page 421 and 422:
steel debris. Glass transition temp
- Page 423 and 424:
i. Degree of Cure Epoxy film sample
- Page 425 and 426:
8.5 Suitable plugs shall be provide
- Page 427 and 428:
mechanical repairs, the remaining w
- Page 429 and 430:
9.1 Pipe Heating 9.1.1 Immediately
- Page 431 and 432:
ecycling system shall be at least (
- Page 433 and 434:
. Thickness of epoxy and adhesive s
- Page 435 and 436:
10.8 Air Entrapment Test a. Strips
- Page 437 and 438:
CONTRACTOR shall give reasonable no
- Page 439 and 440:
straps shall be used for securing l
- Page 441 and 442:
13.0 MARKING Testing of repairs sha
- Page 443 and 444:
Coating system/ Material Prequalifi
- Page 445 and 446:
PROCESS & PIPING DESIGN SECTION MEC
- Page 447 and 448:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 449 and 450:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 451:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 454 and 455:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 456 and 457:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 458 and 459:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 460 and 461:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 462 and 463:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 464 and 465:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 466 and 467:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 468 and 469:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 470 and 471:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 472 and 473:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 474 and 475:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 476 and 477:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 478 and 479:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 480 and 481:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 482 and 483:
SPECIFICATION FOR HEALTH, SAFETY AN
- Page 484 and 485:
1.0 SCOPE This specification establ
- Page 486 and 487:
3.1.9 The Contractor shall ensure p
- Page 488 and 489:
f) Hazardous and/or toxic material
- Page 490 and 491:
- Provided posters, banners, for sa
- Page 492:
1.0 HEALTHY, SAFETY & ENVIRONMENT (
- Page 495 and 496:
MONTHLY CHECKLIST CUM COMPLIANCE RE
- Page 497 and 498:
MONTHLY CHECKLIST CUM COMPLIANCE RE
- Page 499 and 500:
MONTHLY CHECKLIST CUM COMPLIANCE RE
- Page 501 and 502:
ANNEXURE-B Format-4 4.0 SUPPLEMENTA
- Page 503 and 504:
SPECIFICATION FOR QUALITY ASSURANCE
- Page 505 and 506:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 507 and 508:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 509 and 510:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 511 and 512:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 513 and 514:
\\Akjha\work contrac\standard TS fo
- Page 515 and 516:
C O N T E N T S Sl. No. Description
- Page 517 and 518:
pipelines in the scope of work shou
- Page 519 and 520:
about the degree of cleanliness of
- Page 521 and 522:
The contractor shall be responsible
- Page 523 and 524:
14.0 INFORMATION TO BE FURNISHED BY
- Page 525 and 526:
SPECIFICATIONS FOR FIELD JOINT COAT
- Page 527 and 528:
1.0 SCOPE 1.1 General This specific
- Page 529 and 530:
3.1.3 Sleeve Adhesive The inner sur
- Page 531 and 532:
Sl. No. Property Test Method Condit
- Page 533 and 534:
3.4 Qualification for Contractor’
- Page 535 and 536:
equirements of this specification m
- Page 537 and 538:
sleeves shall be obtained without u
- Page 539 and 540:
7.0 REPAIR OF FIELD JOINT COATING 7
- Page 541 and 542:
SPECIFICATION FOR PIPELINE CROSSING
- Page 543 and 544:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 545 and 546:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 547 and 548:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 549 and 550:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 551 and 552:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 553 and 554:
D:\TS\Flow Tees - 011 - TS.doc PROC
- Page 555 and 556:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 557 and 558:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 559 and 560:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 561 and 562:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 563 and 564:
MECON LIMITED DELHI D:\TS\Lond Redi
- Page 565 and 566:
MECON LIMITED DELHI D:\TS\Lond Redi
- Page 567 and 568:
MECON LIMITED DELHI D:\TS\Lond Redi
- Page 569 and 570:
MECON LIMITED DELHI D:\TS\Lond Redi
- Page 571 and 572:
D:\TS\Insulating Joints - 09 - TS.d
- Page 573 and 574:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 575 and 576:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 577 and 578:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 579 and 580:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 581 and 582:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 583 and 584:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 585 and 586:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 587 and 588:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 589 and 590:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 591 and 592:
CONTRACTOR ORDER NO. & DATE SUB-CON
- Page 593 and 594:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 595 and 596:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 597 and 598:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 599 and 600:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 601 and 602:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 603 and 604:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 605 and 606:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 607 and 608:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 609 and 610:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 611 and 612:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 613 and 614:
D:\TS\QOEC - 013 - TS.doc SPECIFICA
- Page 615 and 616:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 617 and 618:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 619 and 620:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 621 and 622:
D:\Technical Specifications & Stand
- Page 623 and 624:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 625 and 626:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 627 and 628:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 629 and 630:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 631 and 632:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 633 and 634:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 635 and 636:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 637 and 638:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 639 and 640:
PROCESS & PIPING DESIGN SECTION MEC
- Page 641 and 642:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 643 and 644:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 645 and 646:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 647 and 648:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 649 and 650:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 651 and 652:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 653 and 654:
PROCESS & PIPING DESIGN SECTION MEC
- Page 655 and 656:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 657 and 658:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 659 and 660:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 661 and 662:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 663 and 664:
MECON LIMITED DELHI D:\old data\FAT
- Page 665 and 666:
MECON LIMITED DELHI D:\old data\FAT
- Page 667 and 668:
MECON LIMITED DELHI D:\old data\FAT
- Page 669 and 670:
MECON LIMITED DELHI D:\old data\FAT
- Page 671 and 672:
MECON LIMITED DELHI D:\old data\FAT
- Page 673 and 674:
MECON LIMITED DELHI D:\old data\FAT
- Page 675 and 676:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 677 and 678:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 679 and 680:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 681 and 682:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 683 and 684:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 685 and 686:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 687 and 688:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 689 and 690:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 691 and 692:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 693 and 694:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 695 and 696:
PROCESS & PIPING DESIGN SECTION MEC
- Page 697 and 698:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 699 and 700:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 701 and 702:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 703 and 704:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 705 and 706:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 707 and 708:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 709 and 710:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 711 and 712:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 713 and 714:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 715 and 716:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 717 and 718:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 719 and 720:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 721 and 722:
PROCESS & PIPING DESIGN SECTION MEC
- Page 723 and 724:
1.0 SCOPE The specification covers
- Page 725 and 726:
5.0 TESTS ON SOIL SAMPLES Soil/ wat
- Page 727 and 728:
8.2 Measures that will be taken to
- Page 729 and 730:
Sl.No. Description 1.0 SCOPE 2.0 CO
- Page 731 and 732:
4.0 GENERAL REQUIREMENTS 4.1 CPPSM
- Page 733 and 734:
5.4 CPPSM shall preferably be of na
- Page 735 and 736:
The under surfaces shall be prepare
- Page 737:
) Ratings of major components and a