MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

Document6<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE MAINLINE CONSTRUCTION<br />

(ONSHORE)<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 18 OF 53<br />

MEC/S/05/62/01 REVISION A<br />

Materials excluding line pipe shall be stored in sheltered storages. Such<br />

materials shall not be strung on the Right-<strong>of</strong>-Way but shall be transported in<br />

covered conveyances for use only at the time <strong>of</strong> installation.<br />

CONTRACTOR shall ensure that all valves and whenever applicable, other<br />

materials are fitted with suitable end covers <strong>of</strong> the type approved by COMPANY.<br />

Materials with worked surfaces such as flanges, pipe fittings, etc. must be<br />

stacked and handled so as to avoid contact with the ground or with substances<br />

that could damage them.<br />

The manufacturer's instructions regarding temperature and procedure for storing<br />

materials which are subject to alteration <strong>of</strong> the original properties and<br />

cnaracteristics did to unsuitable storage must be strictly complied with and, if<br />

required, an adequate heat conditioning shall be provided for these materials.<br />

When supplied in containers and packages they must not be thrown or<br />

dropped, not handled using hooks which could damage the container or the<br />

materials, either during loading/unloading or during successive handling, until<br />

their final use.<br />

Storage <strong>of</strong> coating materials which are susceptible to deterioration or damages<br />

especially due to humidity, exposure to high thermal cconditions or other<br />

diverse weather conditions, shall be suitably stored and protected. These<br />

materials shall be kept permanently in store, supported above the ground in a<br />

dry place, protected against the weather and transported for use only at the time<br />

and in quantities necessary for immediate application. Deteriorated materials<br />

shall not be used and replaced with no extra cost to COMPANY.<br />

5.6 Identification<br />

CONTRACTOR shall provide all pipes, bends, etc. greater than 2" with serial<br />

numbers as soon as possible and measure their length and state is on the<br />

pipes, etc. Pipes to be bent shall be measured prior to bending. Identification<br />

(i.e. letter, number and length) shall be indelible.<br />

All serial numbers shall be recorded in a list, which shall also state appurtenant<br />

pipe numbers.