geometry inspection to generate valid data for any <strong>of</strong> the pipeline,<br />

CONTRACTOR will make extra runs <strong>of</strong> pigs to get valid and physically<br />

verifiable data.<br />

12.2 Stuck-Up Tool<br />

The BIDDER shall details out a contingency plan in his BID as proposed by<br />

him in case any <strong>of</strong> the pigs get stuck up. The plan shall identify procedure<br />

for exactly locating the stuck up pig, detail procedure for retrieval <strong>of</strong> pig,<br />

equipment, including support facilities required to retrieve the pig.<br />

If pig do not move from stuck up location, by any measure, then the<br />

pipeline section shall have to be cut for retrieval <strong>of</strong> Pig. Necessary<br />

erection, fabrication and modification <strong>of</strong> pipe with new pipe piece after<br />

retrieval <strong>of</strong> pig shall be done by Contractor. The cost for this works shall<br />

be borne by Contractor on actuals. After fabrication & erection, pigging<br />

contractor shall run Gauge pig to check internal restriction, if any.<br />

Locating the stuck up pig and its retrieval shall be the responsibility <strong>of</strong> the<br />

CONTRACTOR.<br />

13.0 WORK REPORT<br />

The work report shall be prepared and submitted in hard copy (4 sets)<br />

and Electronics media (2 sets)<br />

The work report shall consist <strong>of</strong> following as a minimum.<br />

- All field activities.<br />

- Equipment description<br />

- List <strong>of</strong> installations<br />

- List <strong>of</strong> significance with feature information and installation<br />

reference<br />

- Survey log and enlargement areas <strong>of</strong> special interest to suitable<br />

scale.<br />