MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION FOR<br />

PERMANENT CATHODIC<br />

PROTECTION SYSTEM<br />

TECHNICAL SPECIFICATION NO. : MEC/TS/05/62/016B REV-1 Page 9 <strong>of</strong> 24<br />

The anode shall be hollow type centrally connected or solid type end<br />

connected, cable to anode joint shall be reliable and adequate for derigh life <strong>of</strong><br />

anode.<br />

iv) Sheet steel anode canisters <strong>of</strong> adequate size shall be provided for each anode<br />

<strong>of</strong> selected Anode canisters shall be filled with petroleum coke breeze with a<br />

typical carbon content <strong>of</strong> 91.77%. String anode shall be used for days well<br />

ground bed.<br />

In case <strong>of</strong> deep well ground beds calcined fluid petroleum coke breeze with a<br />

typical carbon content <strong>of</strong> 91.77% shall be provided in the well surrounding the<br />

anodes.<br />

v) Each shallow anode bed shall contain anodes with canisters positioned<br />

horizontal or vertical in the soil with suitable backfill at appropriate depth with<br />

respect to configuration horizontal or vertical.<br />

vi) Layout <strong>of</strong> anode installation in anode bed shall be detailed out in drawings<br />

showing anode installation details, anode grouping, anode wiring, anode cable<br />

routing etc.<br />

The deepwell anode ground bed details shall include the details <strong>of</strong> anodes,<br />

deepwell casing, anode positioning, anode cable supporting, deepwell gas<br />

venting, active, passive portions <strong>of</strong> ground bed etc.<br />

vii) Anodes shall be supplied complete with tail cables which shall be long enough<br />

for termination on their associated junction boxes without intermediate joints.<br />

Exact lengths and termination details shall be indicated in construction<br />

drawings by Contractor.<br />

viii) Anode bed separation from pipeline shall be tested for interaction.<br />

ix) Potential gradient around the anode bed shall be within safety requirements<br />

and its effective boundary shall be defined and secured.<br />

x) In case two parallel pipelines running in the same ROW. The anode ground<br />

beds <strong>of</strong> respective pipelines shall be located on the respective sides <strong>of</strong> the<br />

pipelines.<br />

xi) The depth <strong>of</strong> deepwell anode ground bed shall be sufficient enough to reduce<br />

anode influence on incidental structures within proposed location.<br />

7.3 Anode Junction Box<br />

i) Depending on the size and configuration <strong>of</strong> anode ground beds, one or more<br />

anode junction boxes shall be provided at each ground bed.<br />

All cable tails from individual anodes shall be terminated onto these anode<br />

junction boxes which shall be further connected to anode cable coming from<br />

CP station power source.<br />

ii) Junction boxes shall have sheet steel enclosure <strong>of</strong> minimum 3 mm thickness<br />

and hinged lockable shutters. They shall be weatherpro<strong>of</strong> with degree <strong>of</strong><br />

protection IP-55. Junction boxes shall have anode bus and terminal plate with<br />

adequate number <strong>of</strong> antiloosening type <strong>of</strong> identified terminals. Provision shall<br />

be made for measurement and control <strong>of</strong> individual anode current by providing<br />

D:\old data\FATEH\MP Region\Kailaras\Tender RFQ\TCP&PCP\Permanent Cathodic Proection - 016B-R1.doc