MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE PIPELINES CROSSING ROADS, SPECIFICATION NO. PAGE 7 OF 10<br />

RAILROADS, MINOR WATER AND<br />

OTHER CROSSINGS MEC/S/05/62/05 REVISION 0<br />

3.7 The assembly <strong>of</strong> vent pipe units as approved by COMPANY shall be carried out<br />

by direct insertion and welding to the ends <strong>of</strong> the casing pipe before introducing<br />

the carrier pipe. The operation <strong>of</strong> assembling and extending the vent pipe shall<br />

be carried out in such a way that there is no contact with the carrier pipe. The<br />

painting/ coating <strong>of</strong> the vent pipes shall be applied before backfilling as per<br />

relevant specifications.<br />

3.8 The casing pipe shall be considered ready for installation <strong>of</strong> the carrier pipe,<br />

after careful inspection and internal cleaning with the removal <strong>of</strong> soil, mud,<br />

stones and other foreign materials.<br />

3.9 Insulators, as approved by COMPANY, shall be securely fastened to the pipe<br />

with all bolts and fixtures firmly tightened. The number <strong>of</strong> insulators and spacing<br />

shall be as shown in the drawings or at 2.5m intervals (whichever is more<br />

stringent). At the end <strong>of</strong> both sides <strong>of</strong> the casing, a double set <strong>of</strong> insulators shall<br />

be installed.<br />

3.10 Care must be taken in pushing or pulling carrier pipe into the casing so that the<br />

pipe is aligned correctly in the casing and that the pushing or pulling force is<br />

evenly and constantly applied to avoid damages to the insulators. A nose piece<br />

having a diameter equal to that <strong>of</strong> the pipe shall be welded on the front and back<br />

end <strong>of</strong> the carrier pipe to facilitate installation <strong>of</strong> the carrier pipe properly in the<br />

casing and to keep it dry and clean.<br />

3.11 After installation <strong>of</strong> the carrier pipe section, the casing and the appurtenances,<br />

but prior to making tie-in welds and backfilling, an electrical test shall be<br />

conducted by the CONTRACTOR in the presence <strong>of</strong> the COMPANY, to<br />

determine the resistance between the casing and the carrier pipe or the carrier<br />

pipe and the soil. These tests shall show at least a resistance <strong>of</strong> 100 kohm/m 2 .<br />

After backfilling and compaction, additional tests shall be conducted to<br />

determine if the casing is electrically shorted to the pipe. If the installation is<br />

found to be shorted, CONTRACTOR shall make the necessary corrections and<br />

repairs at his cost, until a test to the satisfaction <strong>of</strong> the COMPANY is obtained.<br />

4.0 CROSSINGS OF BURIED SERVICES<br />

4.1 The pipeline under construction may pass above or below the existing buried<br />

facilities such as pipelines, cables, etc. Type <strong>of</strong> crossing shall be such that a<br />

minimum depth <strong>of</strong> cover as required in the drawings and specifications are<br />

guaranteed. The minimum clearance required between pipeline and the existing<br />

facility shall be 500mm.<br />