Company Representative reserves the right to ask for additional measurement at<br />

any location on the field joint coating, whenever doubt arises.<br />

5.4 Peel Strength Testing<br />

5.4.1 One out <strong>of</strong> every 50 joint coatings or one joint coating out <strong>of</strong> every day’s<br />

production whichever is stringent shall be tested to establish the peel strength on<br />

steel and factory applied coating. Contractor shall carry out such testing in the<br />

presence <strong>of</strong> Company Representative.<br />

5.4.2 From each test sleeve selected as above, one or more strips <strong>of</strong> size 25mm x<br />

200mm shall be cut perpendicular to the pipe axis and slowly peeled <strong>of</strong>f.<br />

The required peel strength shall meet the requirements <strong>of</strong> this specification as<br />

applicable for (+) 23°C or (+) 60°C whichever is feasible. This test shall be<br />

conducted between wrapping & metal and mill coating & between layers at overlap<br />

with joint coating (wherever applicable). After removal <strong>of</strong> strip, the bulk <strong>of</strong><br />

adhesive shall remain adhered to the pipe showing no bare metal, otherwise, test<br />

shall be considered failed. The adhesive layer that remains on the pipe surface<br />

shall generally be free <strong>of</strong> voids resulting from air or gas inclusion. In case the peel<br />

strength test at a different temperature than that specified in warranted due to the<br />

ambient site conditions, then the peel strength shall comply the recommendation <strong>of</strong><br />

the manufacturer. Manufacturer shall be asked to furnish peel strength values<br />

corresponding to various expected temperatures, prior to start <strong>of</strong> the works.<br />

5.4.3 If the sleeve does not meet the requirements <strong>of</strong> clause 5.4.2 the adjacent two<br />

sleeves shall also be tested. If the adjacent two sleeves are acceptable the test rate<br />

shall be increased to one sleeve every twenty five until Company’s Representative<br />

is satisfied. The test rate can then be reduced as per clause 5.4.1. If either or<br />

both <strong>of</strong> the adjacent two sleeves do not meet the requirements <strong>of</strong> clause 5.4.2, the<br />

field joint shall be stopped.<br />

5.4.4 Company Representative reserve the right <strong>of</strong> 100% removal <strong>of</strong> sleeves if he is not<br />

convinced that the requirements <strong>of</strong> clause 5.4.2 are achieved.<br />

6.0 REPAIRS<br />

6.1 If a field joint is detected to be unacceptable after testing as per section 5.0 <strong>of</strong> this<br />

specification the Contractor shall, at his own cost :<br />

- Determine the cause <strong>of</strong> the faulty results <strong>of</strong> the field coating.<br />

- Mobilise the expert <strong>of</strong> manufacturer, if required.<br />

- Test to be complete satisfaction <strong>of</strong> the COMPANY, already completed field<br />

coatings.<br />

D:\old data\FATEH\Aban Power\TS\Specification for Field Joint Coaitng-13B.doc Page 10 <strong>of</strong> 11