MECON LIMITED<br />

REGD. OFF: RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE PIPING FABRICATION AND<br />

ERECTION<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 8 OF 62<br />

MEC/S/05/62/06 REVISION 0<br />

9.7 Pressure gauges shall be installed on line to measure test pressures. In case <strong>of</strong><br />

longer lines two or more pressure gauges shall be installed as directed by<br />

COMPANY. One gauge shall be installed at the discharge <strong>of</strong> the pressurising<br />

pump. Pressure gauge used for hydrostatic testing shall be calibrated with dead<br />

weight tester in the presence <strong>of</strong> Engineer-in-charge. Range <strong>of</strong> pressure gauge<br />

shall generally be 1.5 times the test pressure.<br />

9.8 Orifice plates and restriction orifices shall not be installed until hydrostatic testing<br />

is completed. Temporary gaskets shall be used during testing.<br />

9.9 First block valve <strong>of</strong> pressure instruments shall be half open & plugged at the<br />

time <strong>of</strong> hydrostatic testing. Temperature connections shall be blanked <strong>of</strong>f during<br />

testing.<br />

9.10 All equipments, in line instruments, relief valves shall be disconnected from<br />

piping system by means <strong>of</strong> blinds during testing. Control valves shall be<br />

replaced by spool pieces during testing.<br />

9.11 High point vents and low point drain required for testing in addition to those<br />

marked in the drawings shall be provided by CONTRACTOR at his own cost.<br />

9.12 All welded and screwed joints shall be kept clean for detecting leaks during<br />

testing.<br />

9.13 Test pressure shall be maintained long enough to facilitate complete inspection<br />

<strong>of</strong> the system. Minimum duration <strong>of</strong> test shall be 6 hours unless other wise<br />

specified. Pressurising equipment shall be isolated immediately after test<br />

pressure is attained.<br />

9.14 After successful completion <strong>of</strong> hydrostatic testing, the piping system shall be<br />

dewatered. All lines shall be completely dried using compressed air.<br />

CONTRACTOR shall make his own arrangement for supply <strong>of</strong> compressed air.<br />

Drying <strong>of</strong> lines shall be considered complete on approval by COMPANY.