MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\04A major water crossing\Major Water Crossing -Final 04.doc<br />

STANDARD SPECIFICATION<br />

TITLE MAJOR WATER CROSSINGS SPECIFICATION NO. PAGE 5 OF 14<br />

MEC/S/05/62/04 REVISION 0<br />

2.3 CONTRACTOR shall comply with all the conditions and requirements issued by<br />

authorities having jurisdiction in the area where the work is to be performed.<br />

CONTRACTOR shall, at his own responsibility, obtain necessary permits from<br />

the authorities having jurisdiction, for performing his work.<br />

If no public roads exist, CONTRACTOR shall arrange on his own for access to<br />

his work area at no extra cost to COMPANY.<br />

2.4 Pre-construction Surveys<br />

Prior to start <strong>of</strong> any work, CONTRACTOR shall carry out a survey <strong>of</strong> the major<br />

water crossings and acquaint himself with site conditions and to collect any data<br />

regarding the water velocity and the tidal variations in the flow pattern and shall<br />

verify the suitability <strong>of</strong> his equipment and the methods <strong>of</strong> construction.<br />

3.0 TRENCHING<br />

3.1 Dredging/ Excavating<br />

3.1.1 CONTRACTOR shall dredge or excavate the trench for the water crossing in<br />

conformity with the approved drawings. Dredging <strong>of</strong> the trench shall be executed<br />

as accurately as possible.<br />

3.1.2 The trench shall be excavated to such depth as required to provide the minimum<br />

cover and the pipeline configuration as specified. The pipeline pr<strong>of</strong>ile <strong>of</strong> the<br />

crossings shall be followed as accurately as possible. Before laying, the trench<br />

shall be cleaned and levelled. The trench shall be subject to inspection by<br />

COMPANY prior to installation <strong>of</strong> the pipe.<br />

3.1.3 Navigational traffic shall not be obstructed, unless permission has been given<br />

thereto. CONTRACTOR shall issue all necessary publications according to the<br />

local regulations. Instructions given by authorities shall be followed accurately<br />

and immediately, so that there in no hindrance to traffic. For stoppage <strong>of</strong><br />

navigational traffic public notification, PA system, signal/ sign etc. shall be<br />

provided.<br />

CONTRACTOR cannot request a compensation if his work is hampered or<br />

delayed due to weather conditions, any obstacles/ or by any traffic on the spot,<br />

where work is executed.<br />

3.1.4 CONTRACTOR is fully responsible for the execution <strong>of</strong> the blasting (whenever<br />

permitted) the dredging and excavation work, hopping <strong>of</strong> the soil, transportation,<br />

dumping on land or in water, all to be executed in agreement with authorities,<br />

land owners and COMPANY.