MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

c:\fateh\standard\stad-eqp.wp<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE Hydrostatic Testing <strong>of</strong> Onshore Cross- SPECIFICATION NO. PAGE 9 OF 17<br />

country Pipelines<br />

MEC/S/05/62/03 REVISION A<br />

7.8 Air <strong>Volume</strong> Calculation<br />

In order to check the presence <strong>of</strong> air in the pipeline, two separate consecutive pressure<br />

lowering <strong>of</strong> 0.5 bar shall be carried out.<br />

For calculation <strong>of</strong> air in the pipeline the second pressure lowering shall be used, and<br />

the relevant drained water shall be accurately measured (V1). This amount measured<br />

shall be compared to the theoretical amount (Vp) corresponding to the pressure<br />

lowering that has been carried out, by using the procedure outlined in clause 12.1 <strong>of</strong><br />

this specification.<br />

If no air is present in the length under test:<br />

V1<br />

--- = 1<br />

Vp<br />

In order that the above ratio is acceptable, it shall not differ from 1 by more than 6%<br />

(i.e. 1.06).<br />

If the air found in the pipeline is within the above established tolerance, then the<br />

pressurizing can continue. If the ratio V1 / Vp exceeds 1.06, the hydrostatic testing<br />

cannot go on and additional pig passages shall be performed to remove the air<br />

pockets.<br />

The test shall be repeated as per the above procedure until above estimated<br />

tolerances are satisfied. The pressurizing can then continue, to reach the value <strong>of</strong> test<br />

pressure.<br />

7.9 Testing<br />

After the section has been pressurized and the air volume test has given acceptable<br />

results the test pressure shall be held for a minimum <strong>of</strong> 24 hours after stabilization.<br />

After temperature and pressure has stabilized, the injection pump shall be<br />

disconnected and all connections at the test heads shall be checked for leakage. The<br />

pressure recorders shall then be started with the charts in a real time orientation for<br />

continuous recording throughout the test.<br />

During the testing period the following measurements shall be recorded :<br />

- every one hour pressure measurements form dead weight testers.<br />

- every two hours the ambient temperature and the pipe temperature at the<br />

thermocouples.<br />

All data shall be recorded on appropriate forms attached to the hydrostatic test<br />

procedure manual. Care shall be taken that the maximum test pressures are not exceeded.