6.7 Graphical representation <strong>of</strong> existing structure/ pipe to soil potential<br />

records, Transformer Rectifier Unit/ CP Power source voltage/ current<br />

readings.<br />

6.8 Possibilities <strong>of</strong> integration/ isolation <strong>of</strong> the pipeline CP System with<br />

foreign pipeline/ structure CP System, which may involved negotiation<br />

with Owner’s <strong>of</strong> foreign services.<br />

6.9 Information on existing and proposed DC/ AC power sources and<br />

system in the vicinity <strong>of</strong> the entire right <strong>of</strong> way.<br />

6.10 Crossing and parallel running <strong>of</strong> electrified and non-electrified railway<br />

tracks alongwith details <strong>of</strong> operating voltage and type (AC/ DC).<br />

6.11 Crossings or parallel running <strong>of</strong> any H.T. AC/ DC overhead line with in<br />

approximately 25 mtr from ROW alongwith details <strong>of</strong> voltage rating,<br />

fault level etc.<br />

6.12 Any other relevant information that may be needed in designing and<br />

implementing <strong>of</strong> proper cathodic protection scheme for the proposed<br />

pipeline.<br />

7.0 REPORT<br />

On completion <strong>of</strong> all the field and laboratory work an interim report<br />

incorporating results generated from surveys, additional data collected,<br />

results <strong>of</strong> test carried out, etc. shall be submitted for comments/<br />

approval. The final report incorporating comments/ missing data shall<br />

be furnished for records. The report alongwith various drawings,<br />

graphs etc. prepared in connection with the work shall be submitted<br />

alongwith six prints by the contractor.<br />

8.0 INFORMATION REQUIRED WITH BID<br />

Bidder shall provided following information alongwith the bid without<br />

which the bids are liable for summary rejection.<br />

8.1 Instruments that will be used for carrying out soil resistivity survey.<br />

D:\old data\FATEH\MP Region\Kailaras\Tender RFQ\TCP&PCP\Specification - Corrosion Survey - 016C.doc<br />

Page 4 <strong>of</strong> 5