MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE PIPELINES CROSSING ROADS, SPECIFICATION NO. PAGE 3 OF 10<br />

RAILROADS, MINOR WATER AND<br />

OTHER CROSSINGS MEC/S/05/62/05 REVISION 0<br />

• Working method with equipment<br />

• Test procedure<br />

• Manpower deployment<br />

• Calculations <strong>of</strong> temporary works<br />

• Soil investigations, etc.<br />

Such works shall be without any extra cost to COMPANY.<br />

2.3 Pipeline crossings for road, railroad, canals and rivers etc., shall be<br />

hydrostatically pretested ex-situ, prior to joint coating, whenever,<br />

• Crossing is executed by boring ;<br />

• Crossing is installed in casing pipe;<br />

• River crossing pipes which are to be continuously concrete weight coated<br />

(to be tested prior to concrete coating);<br />

• Whenever, in COMPANY's opinion, the repair <strong>of</strong> pipeline at crossing, in<br />

case <strong>of</strong> a leak during final hydrostatic testing, would require inordinate<br />

amount <strong>of</strong> effort and/ or time;<br />

• Whenever pretesting is insisted upon by the Authorities having<br />

jurisdication over the utility crossed.<br />

The section <strong>of</strong> the pipeline for the crossings shall be tested as a single string.<br />

Unless specified otherwise in the CONTRACT, the test pressure shall be the<br />

one resulting in a hoop stress corresponding to 90% <strong>of</strong> SMYS <strong>of</strong> pipe material.<br />

Test pressure shall be retained in the pipeline for minimum period <strong>of</strong> 2 hours.<br />

Test section shall be visually examined for leaks/ defects, etc.<br />

3.0 ROAD AND RAILROAD CROSSINGS<br />

3.1 The work under crossings shall include necessary clearing, grading and<br />

trenching to required depths and widths, welding <strong>of</strong> casing (when required) and<br />

carrier pipes, coating, lowering-in, backfilling, clean-up, restoration to the original<br />

condition and further strengthening and protective works, testing, installation <strong>of</strong><br />

assemblies, insulators and seals, and temporary works such as sheet pilling,<br />

bridges, etc.<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\05 pipeline crossing road,railroad , minor water etc\PCR-MWC final-1 05.doc