MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION FOR<br />

PERMANENT CATHODIC<br />

PROTECTION SYSTEM<br />

TECHNICAL SPECIFICATION NO. : MEC/TS/05/62/016B REV-1 Page 18 <strong>of</strong> 24<br />

f) Polarisation Cell<br />

- Location / Identification number<br />

- Rating<br />

- Check for electrolyte<br />

- Check for wiring<br />

- Check standby current drain after CP system energisation. (Current drain with<br />

respect to voltage across the cell shall be recorded).<br />

- Details <strong>of</strong> grounding provided for the polarisation cell.<br />

g) Spark Gap Arrester<br />

- Location/ identification NO<br />

- Ratings<br />

- Check for healthiness<br />

h) Anode Ground Bed<br />

- Location / Station<br />

- Check for actual layout and compliance with drawings<br />

- Resistance <strong>of</strong> each individual anode<br />

- Current dissipation by each individual anode with respect to anode voltage<br />

- Total resistance <strong>of</strong> complete anode bed<br />

- Mutual interference<br />

i) Grounding Cell<br />

- Location<br />

- Type / no. <strong>of</strong> anodes<br />

- Ratings<br />

11.2 CP Commissioning Procedure<br />

A model commissioning procedure for a 2 station CP system <strong>of</strong> a pipeline is given<br />

below for general guidance. Contractor shall develop detailed commissioning<br />

procedure as per this guideline and get it approved before commencing CP system<br />

commissioning activities.<br />

i) On completion <strong>of</strong> installation <strong>of</strong> anode beds and other systems as envisaged in<br />

this specification, they shall be individually checked, tested and compared<br />

against the agreed specifications and procedure.<br />

ii) The CP commissioning shall be carried out with current interrupter provided in<br />

the output <strong>of</strong> the CP TR/ ECU Unit to measure CP “ON” & “OFF” potentials.<br />

iii) Current dissipated by each anode shall be corrected through anode lead<br />

junction box.<br />

iv) Electrical continuity <strong>of</strong> the entire pipeline shall be verified in conformity with<br />

design.<br />

v) Input resistance <strong>of</strong> the pipeline at all the drainage points shall be checked and<br />

recorded.<br />

D:\old data\FATEH\MP Region\Kailaras\Tender RFQ\TCP&PCP\Permanent Cathodic Proection - 016B-R1.doc