04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE WELDING OF ONSHORE GAS<br />

SPECIFICATION NO. PAGE 41 OF 48<br />

PIPELINES<br />

MEC/S/05/62/02 REVISION<br />

ANNEXURE-<strong>II</strong><br />

Sheet 1 <strong>of</strong> 2<br />

STRESS RELIEF HEAT TREATMENT PROCEDURE SPECIFICATION<br />

Name <strong>of</strong> the Heat-Treater :<br />

Name <strong>of</strong> the Project : Specification Reference No.:<br />

1. General Details<br />

Name <strong>of</strong> the Equipment :<br />

Name <strong>of</strong> the Assembly/ Part :<br />

Assembly/ Part Drawing No. :<br />

Material :<br />

2. Furnace Details<br />

Type <strong>of</strong> Heating : Gas/ Oil/ Elec. Res./ Induction<br />

Type <strong>of</strong> Heating : (Tick mark)<br />

Capacity (Size) :<br />

Maximum Temp.(°C) :<br />

Method <strong>of</strong> Temp. :<br />

Measurement<br />

Atmosphere Control :<br />

3. Heat Treatment Cycle Details<br />

Changing Temp. °C :<br />

Rate <strong>of</strong> Heating, °C/ Hr. :<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\02A welding onshore gas pipeline\Welding <strong>of</strong> Onshore Gas Pipelines with addendum - I 02A.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!