MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION FOR<br />

PERMANENT CATHODIC<br />

PROTECTION SYSTEM<br />

TECHNICAL SPECIFICATION NO. : MEC/TS/05/62/016B REV-1 Page 17 <strong>of</strong> 24<br />

iv) All tools, equipment and instruments required for testing shall be provided by<br />

contractor.<br />

v) Generally, the following minimum tests must be carried out and recorded in<br />

pr<strong>of</strong>ormas given in subsequent clauses :<br />

Checking : Visual inspection, comparison with drawings<br />

and specifications.<br />

Inspection : Detailed physical inspection, if necessary, by taking apart<br />

the component parts.<br />

Testing : Simulation tests <strong>of</strong> equipment to determine its<br />

operational fitness.<br />

a) Cables<br />

- Cable no.<br />

- Voltage grade.<br />

- Conductor cross section<br />

- Continuity check<br />

- Voltage test<br />

- Insulation resistance values between each core & earth, between cores.<br />

All cables shall be tested by 500V megger.<br />

b) E/R Probe<br />

- Location / Identification number<br />

- Checking <strong>of</strong> wiring as per schematics<br />

- Resistance reading <strong>of</strong> probe<br />

c) Reference Cell<br />

- Location<br />

- Potential reading<br />

- Type <strong>of</strong> cell<br />

d) Insulating Joint<br />

Insulation resistance across the joint shall be checked before and after<br />

charging the pipeline by means <strong>of</strong> insulating joint tester. Pipe to soil potential<br />

<strong>of</strong> both protected and non-protected sides <strong>of</strong> the insulating joint shall be<br />

checked before and after energisation <strong>of</strong> CP system.<br />

e) Surge Diverter<br />

- Location / identification number<br />

- Rating<br />

- Check for healthyness<br />

D:\old data\FATEH\MP Region\Kailaras\Tender RFQ\TCP&PCP\Permanent Cathodic Proection - 016B-R1.doc