MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

Document6<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE MAINLINE CONSTRUCTION<br />

(ONSHORE)<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 31 OF53<br />

MEC/S/05/62/01 REVISION A<br />

8.1.6 Repair <strong>of</strong> damaged pipe ends by hammering and/or heating is not allowed. If the<br />

dented area is minor and at least 200mm away from the pipe end, and the steel<br />

is not stretched, severed, or split in the COMPANY's opinion, the pipe may be<br />

straightened with a proper jack.<br />

8.2 Pipe Handling And Skid Spacing<br />

8.2.1 When lifting pipe, care must be taken not to kink or overstress it. Proper pipe<br />

slings approved by COMPANY shall be used. CONTRACTOR shall submit his<br />

method <strong>of</strong> skidding and skid spacing for COMPANY's approval. A strip <strong>of</strong> s<strong>of</strong>t<br />

material shall be placed in between skid and pipe to protect the external coating<br />

<strong>of</strong> the pipe. The material shall be approved by the COMPANY.<br />

8.2.2 The maximum skid spacing is not allowed before the stringer bead and the top<br />

and bottom reinforcements are completed, provided that the distance between<br />

the incomplete weld and the skid shall not exceed 9 (nine) percent <strong>of</strong> the skid<br />

spacing.<br />

8.2.3 Skids shall be atleast 1.20 meter long. For pipe with an O.D. <strong>of</strong> 12-3/4 inch and<br />

larger the skids in contact with the pipe shall have a width <strong>of</strong> at least 200mm.<br />

For pipe with an O.D. <strong>of</strong> less than 12 inch the skids in contact with the pipe shall<br />

have a width <strong>of</strong> atleast 150mm. Pipe supports shall be stable, so that pipe<br />

movement will not cause the supports to move. Skids shall not be removed<br />

under a string before lowering in. The welded pipe shall be maintained on skids<br />

at the minimum distance <strong>of</strong> 500mm above ground. Crotches shall be installed at<br />

frequent intervals (atleast every 10th support) with a greater number required at<br />

bends and undulation grounds.<br />

8.3 Night Caps<br />

At the end <strong>of</strong> each day's work or every time when joining and welding operations<br />

are interrupted, the open ends on the welded strings <strong>of</strong> pipes shall be capped<br />

with a securely closed metal cap or plug as approved by COMPANY so as to<br />

prevent the entry <strong>of</strong> dirt, water, or any foreign matter into the pipeline. These<br />

covers shall not be removed until the work is to be resumed. The caps/plugs<br />

used shall be mechanical type and shall not be attached to pipe by welding or<br />

by any other means which may dent, scratch or scar the pipe.