MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

Document6<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE MAINLINE CONSTRUCTION<br />

(ONSHORE)<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 20 OF 53<br />

MEC/S/05/62/01 REVISION A<br />

Care shall be exercised to see that fresh soil recovered from trenching<br />

operation, intended to be used for backfilling over the laid pipe in the trench, is<br />

not mixed with loose debris or foreign material. The excavated material shall<br />

never be deposited over or against the strung pipe.<br />

6.2.2 In steep slope area or on the hillside, before commencing the works, proper<br />

barriers or other protection shall be provided to prevent removed materials from<br />

rolling downhill.<br />

6.2.3 On slopes where there is danger <strong>of</strong> landslide, the pipeline trench shall be<br />

maintained open only for the time strictly necessary. Forever, the COMPANY<br />

may require excavation <strong>of</strong> trench by hand, local route detours and limiting the<br />

period <strong>of</strong> execution <strong>of</strong> the works.<br />

6.2.4 In certain slope sections before the trench cuts through the water table, proper<br />

drainage shall be ensured both near the ditch and the Right-<strong>of</strong>-Way in order to<br />

guarantee soil stability.<br />

6.2.5 All sewers, drains ditches and other natural waterways involved in the execution<br />

<strong>of</strong> the works shall be maintained open and functional. The same applies to<br />

canals, irrigation canals, pipelines and buried facilities crossed by the ditch for<br />

which temporary pipeline shall be laid, if required, and proper temporary<br />

installations provided.<br />

6.3 Blasting<br />

Blasting for trenching and the related removal <strong>of</strong> scattered rock and debris<br />

caused by the blasting from the Right-<strong>of</strong>-Way and/or adjacent property, shall be<br />

performed by CONTRACTOR as part <strong>of</strong> his work.<br />

Every possible precaution shall be taken to prevent injuries and damages to<br />

persons and properties during blasting operations, which shall be performed in<br />

accordance with Standard Rules for Blasting.<br />

CONTRACTOR shall obtain necessary permits for storage and use <strong>of</strong><br />

explosives and comply with the laws, rules and regulations <strong>of</strong> the respective<br />

Governmental agencies having jurisdiction there<strong>of</strong>. No blasting will be allowed<br />

without prior and due notice given by CONTRACTOR to COMPANY,<br />

Government authorities, land-owners, property occupants, adjacent work crew,<br />

and other concerned parties.