MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION FOR<br />

TEMPORARY CATHODIC<br />

PROTECTION SYSTEM<br />

TECHNICAL SPECIFICATION NO. : MEC/TS/05/62/016A REV-1 Page 3 <strong>of</strong> 19<br />

3.3 Report<br />

vii. Crossing and parallel running <strong>of</strong> electrified and non-electrified traction (along<br />

with information regarding operating voltage, type AC/DC etc.) as well as<br />

abandoned tracks near ROW having electrical continuity with the tracks in use.<br />

viii. Crossing and parallel running <strong>of</strong> any HT/AC/DC overhead line<br />

(existing/proposed) along with details <strong>of</strong> voltage, type AC/DC etc.<br />

ix. Voltage rating, number <strong>of</strong> cores and sheathing details <strong>of</strong> under ground power<br />

cables, along ROW or in its vicinity.<br />

x. Information on existing and proposed DC/AC power sources and system having<br />

earth as return path, in the vicinity <strong>of</strong> the entire pipeline, route such as HV/DC<br />

sub stations, fabrication yards with electric welding etc.<br />

xi. Any other relevant information that may be needed in designing and<br />

implementing proper protection scheme for the proposed pipeline.<br />

Unless otherwise mentioned, Contractor shall condut necessary potential<br />

gradient survey for any existing anode ground bed that may interfere with the<br />

CP system <strong>of</strong> the pipeline covered under this project.<br />

xii. Any masonry work for other concrete or non conductive constructions in the<br />

ROW which may block the CP current or cause interference to the pipeline.<br />

xiii. Any underground cable running in parallel or crossing the ROW.<br />

On completion <strong>of</strong> all field work a report incorporating all the results generated from<br />

surveys and details <strong>of</strong> additional data collected shall be furnished. The report shall also<br />

contain detailed interpretation <strong>of</strong> survey results and resistivity data enclosed, probable<br />

interference prone areas etc. to form design basis for the scheme <strong>of</strong> cathodic<br />

protection. This report shall be plotted on semi-log graph sheets.<br />

4.0 CATHODIC PROTECTION DESIGN PARAMETERS<br />

Unless otherwise specified in the project specifications, following parameters shall be<br />

used for design <strong>of</strong> temporary cathodic protection system.<br />

Those parts <strong>of</strong> sacrificial anode cathdic protection system which will be integrated with<br />

permanent CP system shall be designed based on permanent CP parameters.<br />

D:\old data\FATEH\MP Region\Kailaras\Tender RFQ\TCP&PCP\Temporary Cathodic Protection - 016A-R1.doc