- Page 1 and 2:
GAIL (India) Limited TENDER DOCUMEN
- Page 3 and 4:
D:\old data\FATEH\IDPL_Dholpur\SCC\
- Page 5 and 6:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 7 and 8:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 9 and 10:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 11 and 12:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 13 and 14:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 15 and 16:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 17 and 18:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 19 and 20:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 21 and 22:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 23 and 24:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 25 and 26:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 27 and 28:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 29 and 30:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 31 and 32:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 33 and 34:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 35 and 36:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 37 and 38:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 39 and 40:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 41 and 42:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 43 and 44:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 45 and 46:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 47 and 48:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 49 and 50:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 51 and 52:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 53 and 54:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 55 and 56:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 57:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 61 and 62:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 63 and 64:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 65 and 66:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 67 and 68:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 69 and 70:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 71 and 72:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 73 and 74:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 75 and 76:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 77 and 78:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 79 and 80:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 81 and 82:
Pipe Size, Out Side Diamter- Inches
- Page 83 and 84:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 85 and 86:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 87 and 88:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 89 and 90:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 91 and 92:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 93 and 94:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 95 and 96:
\\Akjha\work contrac\standard TS fo
- Page 97 and 98:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 99 and 100:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 101 and 102:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 103 and 104:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 105 and 106:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 107 and 108:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 109 and 110:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 111:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 120 and 121:
SPECIFICATION FOR HYDROSTATIC TESTI
- Page 122 and 123:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 124 and 125:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 126 and 127:
c:\fateh\standard\stad-eqp.wp NEW D
- Page 128 and 129:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 130 and 131:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 132 and 133:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 134 and 135:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 136 and 137:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 138 and 139:
0 C C; \ts\Tender-A,4.doc. TABLE -
- Page 140 and 141:
0 C C; \ts\Tender-A,4.doc. TABLE -
- Page 143 and 144:
SPECIFICATION FOR MAJOR WATER CROSS
- Page 145 and 146:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 147 and 148:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 149 and 150:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 151 and 152:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 153 and 154:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 155 and 156:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 157 and 158:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 159 and 160:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 161 and 162:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 163 and 164:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 165 and 166:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 167 and 168:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 176 and 177:
SPECIFICATION FOR PIPING FABRICATIO
- Page 178 and 179:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 180 and 181:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 182 and 183:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 184 and 185:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 186 and 187:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 188 and 189:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 190 and 191:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 192 and 193:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 194 and 195:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 196 and 197:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 198 and 199:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 200 and 201:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 202 and 203:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 204 and 205:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 206 and 207:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 208 and 209:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 210 and 211:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 212 and 213:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 214 and 215:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 216 and 217:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 218 and 219:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 220 and 221:
Pipe Size, Outside diameter Inches
- Page 222 and 223:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 224 and 225:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 226 and 227:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 228 and 229:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 230 and 231:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 232 and 233:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 234 and 235:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 236 and 237:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 238:
MECON LIMITED REGD. OFF: RANCHI (BI
- Page 278 and 279:
CONTENTS Sl. Description Page No. N
- Page 280 and 281:
1.0 GENERAL 1.1 These technical spe
- Page 282 and 283:
completion and testing on system ar
- Page 284 and 285:
5.1.2 Mill scale, rust, rust scale
- Page 286 and 287:
5.2.3 Maual or hand tool cleaning M
- Page 288 and 289:
c. Ingredients shall be kept proper
- Page 290 and 291:
the bottom. This work shall be done
- Page 292 and 293:
S. NO. DESCRIPTION 1. MANUAL OR HAN
- Page 294 and 295:
S. NO. DESCRIPTION 3. BLAST CLEANIN
- Page 296 and 297:
6.0 PAINT MATERIALS Paint manufactu
- Page 298 and 299:
PAINT MATERIALS TABLE NO.: 6.2FINIS
- Page 300 and 301:
Notes: 1. Covering capacity and DFT
- Page 302 and 303:
TABLE 7.1: PRE-ERECTION/ PRE-FABRIC
- Page 304 and 305:
NOTE 2 : FOR EXTENAL SURFACE OF RCC
- Page 306 and 307:
TABLE 10.0: FIELD PAINT SYSTEM FOR
- Page 308 and 309:
TABLE 12.0 : FIELD PAINT SYSTEM FOR
- Page 310:
TABLE 14.0 : PAINTING UNDER INSULAT
- Page 313 and 314:
17.0 STORAGE 17.1 All paints and pa
- Page 315 and 316:
. Intersection points & change of d
- Page 317 and 318:
20.3 Method of Camouflaging 20.3.1
- Page 319 and 320:
it would be in the interest of the
- Page 321 and 322:
24.5 Tests required for evaluation
- Page 323 and 324:
S. No. MANUFACTURER NAME LIST OF RE
- Page 325 and 326:
S. No. MANUFACTURER NAME LIST OF RE
- Page 327 and 328:
S. NO. LIST OF RECOMMENDED MANUFACT
- Page 329 and 330:
SPECIFICATION FOR REPAIR OF PIPELIN
- Page 331 and 332:
MECON LIMITED DELHI PROCESS & PIPIN
- Page 333 and 334:
SPECIFICATION FOR DOCUMENTATION FOR
- Page 335 and 336:
1.0 SCOPE 1.1 This specification co
- Page 337 and 338: 2.3 Monthly • Priced variations
- Page 339 and 340: - Major water crossings - Waste dis
- Page 341 and 342: - Location of further appurtenance
- Page 343 and 344: Document2 SPECIFICATION FOR PIPELIN
- Page 345 and 346: MECON LIMITED REGD. OFF : RANCHI (B
- Page 347: MECON LIMITED REGD. OFF : RANCHI (B
- Page 355 and 356: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 357 and 358: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 359 and 360: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 361 and 362: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 363 and 364: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 365 and 366: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 367 and 368: MECON LIMITED REGD. OFF : RANCHI (B
- Page 369 and 370: MECON LIMITED REGD. OFF : RANCHI (B
- Page 371: SPECIFICATION FOR VENTS, DRAINS AND
- Page 378 and 379: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 380 and 381: MECON LIMITED REGD. OFF: RANCHI (BI
- Page 382 and 383: 1.0 SCOPE TABLE OF CONTENTS 2.0 COD
- Page 384 and 385: The last letter indicates type of m
- Page 386 and 387: 10.0 GASKETS 10.1 Spiral wound meta
- Page 395 and 396: D:\old data\FATEH\Aban Power\TS\Spe
- Page 397 and 398: 1.0 SCOPE This specification covers
- Page 399 and 400: The heat shrink wraparound sleeve s
- Page 401 and 402: 3.5 Materials shall be stored in sh
- Page 403 and 404: 4.2.1 The wrap around sleeve shall
- Page 405 and 406: 5.0 INSPECTION & TESTING 5.1 Visual
- Page 407 and 408: - Stop field coating until remedial
- Page 409 and 410: 1.0 SCOPE 2.0 REFERENCE DOCUMENTS C
- Page 411 and 412: k. ASTM D-2240 : Test Method for Ru
- Page 413 and 414: 4.0 MATERIALS 4.1 The three layer c
- Page 415 and 416: 5.3.1 Properties of Epoxy Powder an
- Page 417 and 418: pipes as applicable. CONTRACTOR sha
- Page 419 and 420: shall be coated partly with epoxy a
- Page 421 and 422: steel debris. Glass transition temp
- Page 423 and 424: i. Degree of Cure Epoxy film sample
- Page 425 and 426: 8.5 Suitable plugs shall be provide
- Page 427 and 428: mechanical repairs, the remaining w
- Page 429 and 430: 9.1 Pipe Heating 9.1.1 Immediately
- Page 431 and 432: ecycling system shall be at least (
- Page 433 and 434: . Thickness of epoxy and adhesive s
- Page 435 and 436: 10.8 Air Entrapment Test a. Strips
- Page 437 and 438: CONTRACTOR shall give reasonable no
- Page 439 and 440:
straps shall be used for securing l
- Page 441 and 442:
13.0 MARKING Testing of repairs sha
- Page 443 and 444:
Coating system/ Material Prequalifi
- Page 445 and 446:
PROCESS & PIPING DESIGN SECTION MEC
- Page 447 and 448:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 449 and 450:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 451:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 454 and 455:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 456 and 457:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 458 and 459:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 460 and 461:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 462 and 463:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 464 and 465:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 466 and 467:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 468 and 469:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 470 and 471:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 472 and 473:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 474 and 475:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 476 and 477:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 478 and 479:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 480 and 481:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 482 and 483:
SPECIFICATION FOR HEALTH, SAFETY AN
- Page 484 and 485:
1.0 SCOPE This specification establ
- Page 486 and 487:
3.1.9 The Contractor shall ensure p
- Page 488 and 489:
f) Hazardous and/or toxic material
- Page 490 and 491:
- Provided posters, banners, for sa
- Page 492:
1.0 HEALTHY, SAFETY & ENVIRONMENT (
- Page 495 and 496:
MONTHLY CHECKLIST CUM COMPLIANCE RE
- Page 497 and 498:
MONTHLY CHECKLIST CUM COMPLIANCE RE
- Page 499 and 500:
MONTHLY CHECKLIST CUM COMPLIANCE RE
- Page 501 and 502:
ANNEXURE-B Format-4 4.0 SUPPLEMENTA
- Page 503 and 504:
SPECIFICATION FOR QUALITY ASSURANCE
- Page 505 and 506:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 507 and 508:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 509 and 510:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 511 and 512:
MECON LIMITED REGD. OFF : RANCHI (B
- Page 513 and 514:
\\Akjha\work contrac\standard TS fo
- Page 515 and 516:
C O N T E N T S Sl. No. Description
- Page 517 and 518:
pipelines in the scope of work shou
- Page 519 and 520:
about the degree of cleanliness of
- Page 521 and 522:
The contractor shall be responsible
- Page 523 and 524:
14.0 INFORMATION TO BE FURNISHED BY
- Page 525 and 526:
SPECIFICATIONS FOR FIELD JOINT COAT
- Page 527 and 528:
1.0 SCOPE 1.1 General This specific
- Page 529 and 530:
3.1.3 Sleeve Adhesive The inner sur
- Page 531 and 532:
Sl. No. Property Test Method Condit
- Page 533 and 534:
3.4 Qualification for Contractor’
- Page 535 and 536:
equirements of this specification m
- Page 537 and 538:
sleeves shall be obtained without u
- Page 539 and 540:
7.0 REPAIR OF FIELD JOINT COATING 7
- Page 541 and 542:
SPECIFICATION FOR PIPELINE CROSSING
- Page 543 and 544:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 545 and 546:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 547 and 548:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 549 and 550:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 551 and 552:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 553 and 554:
D:\TS\Flow Tees - 011 - TS.doc PROC
- Page 555 and 556:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 557 and 558:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 559 and 560:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 561 and 562:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 563 and 564:
MECON LIMITED DELHI D:\TS\Lond Redi
- Page 565 and 566:
MECON LIMITED DELHI D:\TS\Lond Redi
- Page 567 and 568:
MECON LIMITED DELHI D:\TS\Lond Redi
- Page 569 and 570:
MECON LIMITED DELHI D:\TS\Lond Redi
- Page 571 and 572:
D:\TS\Insulating Joints - 09 - TS.d
- Page 573 and 574:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 575 and 576:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 577 and 578:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 579 and 580:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 581 and 582:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 583 and 584:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 585 and 586:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 587 and 588:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 589 and 590:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 591 and 592:
CONTRACTOR ORDER NO. & DATE SUB-CON
- Page 593 and 594:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 595 and 596:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 597 and 598:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 599 and 600:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 601 and 602:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 603 and 604:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 605 and 606:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 607 and 608:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 609 and 610:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 611 and 612:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 613 and 614:
D:\TS\QOEC - 013 - TS.doc SPECIFICA
- Page 615 and 616:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 617 and 618:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 619 and 620:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 621 and 622:
D:\Technical Specifications & Stand
- Page 623 and 624:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 625 and 626:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 627 and 628:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 629 and 630:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 631 and 632:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 633 and 634:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 635 and 636:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 637 and 638:
MECON LIMITED REGD. OFF RANCHI PROC
- Page 639 and 640:
PROCESS & PIPING DESIGN SECTION MEC
- Page 641 and 642:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 643 and 644:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 645 and 646:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 647 and 648:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 649 and 650:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 651 and 652:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 653 and 654:
PROCESS & PIPING DESIGN SECTION MEC
- Page 655 and 656:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 657 and 658:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 659 and 660:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 661 and 662:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 663 and 664:
MECON LIMITED DELHI D:\old data\FAT
- Page 665 and 666:
MECON LIMITED DELHI D:\old data\FAT
- Page 667 and 668:
MECON LIMITED DELHI D:\old data\FAT
- Page 669 and 670:
MECON LIMITED DELHI D:\old data\FAT
- Page 671 and 672:
MECON LIMITED DELHI D:\old data\FAT
- Page 673 and 674:
MECON LIMITED DELHI D:\old data\FAT
- Page 675 and 676:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 677 and 678:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 679 and 680:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 681 and 682:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 683 and 684:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 685 and 686:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 687 and 688:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 689 and 690:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 691 and 692:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 693 and 694:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 695 and 696:
PROCESS & PIPING DESIGN SECTION MEC
- Page 697 and 698:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 699 and 700:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 701 and 702:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 703 and 704:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 705 and 706:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 707 and 708:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 709 and 710:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 711 and 712:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 713 and 714:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 715 and 716:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 717 and 718:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 719 and 720:
MECON LIMITED Delhi PROCESS & PIPIN
- Page 721 and 722:
PROCESS & PIPING DESIGN SECTION MEC
- Page 723 and 724:
1.0 SCOPE The specification covers
- Page 725 and 726:
5.0 TESTS ON SOIL SAMPLES Soil/ wat
- Page 727 and 728:
8.2 Measures that will be taken to
- Page 729 and 730:
Sl.No. Description 1.0 SCOPE 2.0 CO
- Page 731 and 732:
4.0 GENERAL REQUIREMENTS 4.1 CPPSM
- Page 733 and 734:
5.4 CPPSM shall preferably be of na
- Page 735 and 736:
The under surfaces shall be prepare
- Page 737:
) Ratings of major components and a