health and safety sheets and manufacturer’s recommended application<br />

procedure.<br />

d. Pipe heating, temperatures and control prior to epoxy application.<br />

e. Complete details <strong>of</strong> raw materials including current data sheets showing<br />

values for all the properties specified together with quality control and<br />

application procedure recommendation from manufacturer(s).<br />

f. Application <strong>of</strong> FBE powder, adhesive and polyethylene, including<br />

characteristics, temperature, line speed, application window, curing time,<br />

etc.<br />

g. Quenching and cooling, including time and temperature.<br />

h. Quality assurance system, Inspection and testing methods and reporting<br />

formats, including instrument and equipment types, makes and uses etc.<br />

i. Detailed method <strong>of</strong> repair <strong>of</strong> coating defects duly classified depending upon<br />

nature and magnitude <strong>of</strong> defects and repairs there<strong>of</strong> including coating<br />

stripping technique.<br />

j. Details <strong>of</strong> instrument and equipment calibration methods including relevant<br />

standards and examples <strong>of</strong> calibration certificates.<br />

k. Complete details and inventory <strong>of</strong> laboratory and equipment for procedure<br />

qualification and regular production.<br />

l. Pipe handling and stock piling procedures.<br />

m. Sample <strong>of</strong> recording and reporting formats, including laboratory reports,<br />

certificates and requirement as per clause 6.0 <strong>of</strong> this specification.<br />

n. Complete details <strong>of</strong> test certificates for raw materials including test<br />

methods standards used.<br />

o. Test certificates from PE compound manufacturer for tests for thermal<br />

aging coating resistivity and aging under exposure to light. These test<br />

certificates shall not be older than three years.<br />

p. Health, safety and environment plans.<br />

q. Storage details <strong>of</strong> coating materials and chemicals.<br />

r. Continuous temperature monitoring at various stages <strong>of</strong> coating.<br />

Procedure Qualification Tests (PQT) shall be carried out only after obtaining<br />

written approval <strong>of</strong> the above procedure from COMPANY. No change in the<br />

procedure shall be made after approval has been given by the COMPANY.<br />

However, unavoidable changes shall be executed only after obtaining written<br />

approval from COMPANY.<br />

7.3 Prior to start <strong>of</strong> production, CONTRACTOR shall, at his expense, carry out a<br />

coating procedure qualification trial for each pipe diameter, and for each plant,<br />

to prove that his plant, materials, and coating procedures result in a quality <strong>of</strong><br />

end product conforming to the properties stated in clause 5.3, relevant<br />

standards, specifications and material manufacturer’s recommendations.<br />

CONTRACTOR shall give seven(7) working days notice to witness procedures and<br />

tests.<br />

A batch representing a normal production run, typically 15 pipes, shall be coated<br />

in accordance with the approval coating procedure and the coating operations<br />

witnessed by COMPANY Representative. Out <strong>of</strong> these pipes, at least one pipe<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\14 3-layer pe coated line pipe\3-LPE Coating <strong>of</strong> Linepipes-TS-R2 14.doc Page 9 <strong>of</strong> 35