y. CSA Z245.20-98 : External Fusion Bond Epoxy Coating for<br />

Steel Pipe<br />

The CONTRACTOR shall be familiar with the requirements <strong>of</strong> these documents<br />

and shall make them readily available at the coating plant to all persons<br />

concerned with carrying out the works specified in this specification.<br />

3.0 PLANT SCALE AND INSTALLATION<br />

3.1 CONTRACTOR shall size coating plant(s) after evaluating the scale <strong>of</strong> work and the<br />

time schedule required for the works. Coating plant(s), shall be installed into a yard<br />

whose geometry and dimensions are such as to allow the execution <strong>of</strong> a continuous<br />

work schedule. For this purpose the CONTRACTOR shall ensure non stop work<br />

execution owing to prohibitive adverse weather conditions and when required<br />

CONTRACTOR shall install requisite equipment and plant in ro<strong>of</strong>ed and adequately<br />

weather protected areas.<br />

3.2 Plant equipment, machinery and other facilities shall be in first class operating<br />

condition to atleast meet the job requirements <strong>of</strong> quality and production. Worn out<br />

and improvised plants are not acceptable.<br />

3.3 CONTRACTOR shall, at his own responsibility and cost, provide and prepare all<br />

necessary area for the storage <strong>of</strong> bare and coated pipe and all other materials, for<br />

coating yard, stock-piling and other temporary installation. For each area,<br />

CONTRACTOR shall provide to stipulate servitude agreements as required with the<br />

relevant Authorities, and, on work completion, to clean, restore and pay servitude<br />

and claims for damages, as applicable.<br />

3.4 CONTRACTOR shall at its own responsibility and cost, provide for water and power<br />

supply and other utilities and consumables and obtain authorisation regarding<br />

access roads and other permits required for the execution <strong>of</strong> works conforming to<br />

all the requirements <strong>of</strong> the governing authorities.<br />

3.5 CONTRACTOR shall at its own expense provide a fully equipped laboratory and test<br />

facilities with adequate inventory to carry out tests required for the procedure<br />

qualification and during regular production. Outside testing for qualification and<br />

regular production is not acceptable to COMPANY.<br />

3.6 The CONTRACTOR shall be fully responsible for adherence to all statutory<br />

regulations applicable for handling and disposal <strong>of</strong> the hazardous chemicals during<br />

the coating works.<br />

3.7 The CONTRACTOR shall be responsible for obtaining all statutory approvals/<br />

clearances from relevant Authorities including Pollution Control Board, as applicable<br />

for the coating plant(s).<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\14 3-layer pe coated line pipe\3-LPE Coating <strong>of</strong> Linepipes-TS-R2 14.doc Page 3 <strong>of</strong> 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!