PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE Hydrostatic Testing <strong>of</strong> Onshore Cross- SPECIFICATION NO. PAGE 16 OF 17<br />

country Pipelines<br />

MEC/S/05/62/03 REVISION A<br />

Where,<br />

∆P = pressure change resulting from a temperature change (bar)<br />

∆T algaebrical difference between water temperature at the beginning <strong>of</strong> the test<br />

and water temperature as measured at the end <strong>of</strong> the test (°C).<br />

B = value <strong>of</strong> the difference between the thermal expansion <strong>of</strong> water at the pressure<br />

and temperature as measured at the end <strong>of</strong> the test and that <strong>of</strong> steel (°C -1 ) x 10 6<br />

(Refer table – 1)<br />

A = Isothermal compressibility value <strong>of</strong> water as estimated at the pressure and<br />

temperature values obtained at the end <strong>of</strong> test (bar -1 ) x 10 6 (Refer Figure 1)<br />

r i = nominal inner radius <strong>of</strong> the pipe (mm).<br />

t = nominal thickness <strong>of</strong> pipe (mm).<br />

13.0 PRECAUTIONS DURING THE TEST<br />

In addition to all that has been expressly described in the procedures for carrying out<br />

the tests, the following additional requirements shall be complied with:<br />

13.1 Provision shall be made for the installation <strong>of</strong> no-admittance signs to unauthorized<br />

personnel from the roads to the R.O.W.<br />

13.2 Signs stating "PIPE UNDER TEST-KEEP OFF" with local language translation shall be<br />

placed where the pipeline is uncovered, and particularly where the provisional traps<br />

and stations are located. Such areas shall be suitably fenced in such a way as to<br />

prevent access <strong>of</strong> unauthorized personnel. No unauthorized personnel shall be closer<br />

than 40 m to the pipeline or equipment under test.<br />

13.3 Provisional scraper traps shall be installed in compliance with methods and suitable<br />

locations so that their rupture cannot cause any injuries to the personnel or third<br />

parties.<br />

13.4 The test station shall be placed in such a location as to prevent it from being affected<br />

by a catastrophic failure in the test head.