5.0 INSPECTION & TESTING<br />

5.1 Visual Inspection<br />

Visual inspection <strong>of</strong> the as applied coating shall be carried out on every joint, for<br />

the following :<br />

- Mastic extrusion on either ends <strong>of</strong> the sleeve shall be examined.<br />

- There shall be no sign <strong>of</strong> punctures or pinholes or bend failure. The external<br />

appearance <strong>of</strong> the sleeve shall be smooth, free <strong>of</strong> dimples, air entrapment<br />

or void formation. All sleeves shall be tested for the presence <strong>of</strong> voids by<br />

knocking on the sleeves. A hollow sound compared to the remainder <strong>of</strong> the<br />

sleeve may indicate the presence <strong>of</strong> voids under the sleeve. Such sleeve<br />

shall be tested for adhesion at the discretion <strong>of</strong> the Company<br />

Representative.<br />

- Weld bead pr<strong>of</strong>ile shall be visible through the sleeve.<br />

- Visual indicator provided on the backing and the closure patch showing<br />

desired heat is achieved.<br />

5.2 Holiday Inspection<br />

The holiday detector used shall be checked and calibrated daily with an accurate<br />

DC voltmeter. The detector electrode shall be in direct contact with the surface <strong>of</strong><br />

coating to be inspected.<br />

The entire surface <strong>of</strong> the joint section shall be inspected by means <strong>of</strong> a full circle<br />

holiday detector approved by COMPANY set to a DC voltage applicable as per the<br />

requirements <strong>of</strong> factory applied mainline coating specification <strong>of</strong> Company.<br />

Inspection <strong>of</strong> the sleeves shall be conducted only after the joint has cooled below<br />

50°C. The holiday detector used shall be checked and calibrated daily with an<br />

accurate DC voltmeter. The detector electrode shall be in direct contact with the<br />

surface <strong>of</strong> coating to be inspected.<br />

No field joint shall be covered or lowered in the trench until it has been approved<br />

by the COMPANY.<br />

5.3 As-applied Coating Thickness<br />

Coating thickness shall be checked by non-destructed methods for each field joint.<br />

Average thickness <strong>of</strong> the as-applied coating on pipe body shall be established based<br />

on measurement at min. eight locations i.e. four measurement on either sides <strong>of</strong><br />

the girth weld at 3, 6, 9, & 12 O’clock positions. To establish the minimum<br />

thickness on the girth weld, four measurement shall be taken on apex on the weld<br />

at 3, 6, 9 & 12 O’clock positions. All such measurements shall be recorded.<br />

D:\old data\FATEH\Aban Power\TS\Specification for Field Joint Coaitng-13B.doc Page 9 <strong>of</strong> 11