- Stop field coating until remedial measures are taken against the causes <strong>of</strong> such<br />

faults, to the entire satisfaction <strong>of</strong> the Company.<br />

6.2 CONTRACTOR shall replace all joint found or expected to be unacceptable as per<br />

section 5.0 <strong>of</strong> this specification.<br />

6.3 CONTRACTOR shall, at his own cost repair all areas where the coating has been<br />

removed for testing by COMPANY.<br />

6.4 After the coating work on welded joints, fittings and repairs to the coating have<br />

been completed the coating as a whole shall be tested with a spark-tester before<br />

lowering or jacking the pipeline.<br />

6.5 COMPANY shall be entitled to check the coating on buried pipelines or parts <strong>of</strong><br />

pipelines with equipment such as the "Pearson Meter" and the resistance meter. If<br />

the Coating defects are established, the Contractor shall be responsible for<br />

excavations at such points repair the coating, spark testing and back filling the<br />

excavations without extra charge.<br />

7.0 DOCUMENTATION<br />

7.1 Prior to procurement <strong>of</strong> coating materials, Contractor shall furnish the following<br />

information for qualification <strong>of</strong> the manufacturer and material :<br />

i. Complete information as per clause 5.2, DIN EN 12068 alongwith<br />

descriptive technical catalogues.<br />

ii. Test certificates and results <strong>of</strong> previously conducted tests, for all<br />

properties listed in clause 3.2 <strong>of</strong> this specification.<br />

iii. Reference list <strong>of</strong> previous supplies, in last 5 years, <strong>of</strong> the similar material<br />

indicating the project details such as diameter, quantity, operating<br />

temperature, year <strong>of</strong> supply, project name, contact person and feed back<br />

on performance.<br />

Once the Company’s approval has been given, any change in material or<br />

Manufacturer shall be notified to Company, whose approval in writing <strong>of</strong> all<br />

changes shall be obtained before the materials are manufactured.<br />

7.2 Prior to shipment <strong>of</strong> materials from the Manufacturer’s works. Contractor shall<br />

furnish the following documents :<br />

i. Test certificates/ results as per Manufacturer’s Quality Control Procedure<br />

for each batch <strong>of</strong> materials.<br />

ii. Specific application instructions with pictorial illustrations.<br />

iii. Specific storage and handling instructions.<br />

7.3 All documents shall be in English language only.<br />