6.0 GAUGE PIG RUN<br />

Contractor to carry out adequate number <strong>of</strong> gauging pig runs in each<br />

pipeline covered under Scope <strong>of</strong> work including pig tracking for pipeline to<br />

assess any internal restriction in the pipeline that may restrict the passage<br />

<strong>of</strong> cleaning and caliper pig. Contractor to provide detailed daily site report<br />

for each run in the approved format before commencing the subsequent<br />

run Gauge pig shall be equipped with a gauge plate made <strong>of</strong> Aluminium<br />

having its diameters 95% <strong>of</strong> minimum pipeline Internal Diameter (I.D.).<br />

The gauge pig should be able to pass over or negotiate lateral tees or<br />

bends on the pipeline.<br />

7.0 CLEANING PIG RUN<br />

7.1 Pipelines with Internal Coating<br />

Contractor to carry out adequate number <strong>of</strong> cleaning pig runs by running<br />

suitable cleaning pigs in the pipelines including pig tracking till such time<br />

contractor is satisified with himself about the degree <strong>of</strong> cleanliness <strong>of</strong><br />

pipeline and provide detailed daily site report for each run in the approved<br />

format before commencing the subsequent run. Choice <strong>of</strong> the type <strong>of</strong><br />

cleaning pig has been left to the contractor. The contractor shall assure<br />

that the pigs, which are proposed to be used, are adequately s<strong>of</strong>t and<br />

they do not damage internal coating under any circumstances. The<br />

brushes and scrappers used shall be <strong>of</strong> nonmetallic/ plastic material.<br />

However, the details <strong>of</strong> these pigs including their construction details <strong>of</strong><br />

brushes, scrappers etc. (if applicable) shall be submitted to MECON/ <strong>GAIL</strong><br />

for approval before their usage.<br />

7.2 Pipelines Without Internal Coating<br />

CONTRACTOR to carry out adequate numbers <strong>of</strong> cleaning pig runs by<br />

running suitable cleaning pigs in pipeline covered under SCOPE OF WORK<br />

including pig tracking till such time CONTRACTOR is satisfied with himself<br />