04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MECON LIMITED<br />

REGD. OFF: RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE WELDING OF ONSHORE GAS<br />

SPECIFICATION NO. PAGE 2 OF 48<br />

PIPELINES<br />

MEC/S/05/62/02 REVISION 0<br />

C O N T E N T S<br />

Annexure-I : Electrode Qualification Test Record<br />

Annexure-<strong>II</strong> : Stress Relief Heat Treatment Procedure Specification<br />

Annexure-<strong>II</strong>I : Welding Procedure Qualification Test Record<br />

Annexure-<strong>IV</strong> : Welder Qualification Test Record<br />

Annexure-V : Welders Identification Card<br />

Annexure-VI : Radiographic Procedure for Pipe Welding<br />

PREPARED BY CHECKED BY APPROVED BY<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\02A welding onshore gas pipeline\Welding <strong>of</strong> Onshore Gas Pipelines with addendum - I 02A.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!