04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MECON LIMITED<br />

REGD. OFF RANCHI<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

QUICK OPENING END CLOSURE<br />

TECHNICAL SPECIFICATION NO. : MEC/S/05/62/013 REV-0 Page 7 <strong>of</strong> 7<br />

D:\TS\QOEC - 013 - TS.doc<br />

b) Clause wise list <strong>of</strong> deviation from this specification, if any listed at one place in<br />

the document.<br />

c) Reference list <strong>of</strong> similar supplies for the past five years including project, client,<br />

year <strong>of</strong> supply & contact person.<br />

d) Descriptive technical catalogues <strong>of</strong> the manufacturer.<br />

e) Quality Assurance Plan (QAP) enclosed with this tender duly signed, stamped<br />

and accepted.<br />

10.2 Within two weeks <strong>of</strong> placement <strong>of</strong> order, the manufacturer shall submit four copies <strong>of</strong>,<br />

but not limited to, the following drawings, documents and specifications for approval :-<br />

a) Calculations according to relevant codes for the end closure.<br />

b) Closure assembly and sectional drawing showing all parts with materials and<br />

dimensions.<br />

c) Welding procedure and method <strong>of</strong> manufacture.<br />

Once the above said documents have been approved by the Purchaser, any change in<br />

design, material and method <strong>of</strong> manufacture shall be notified to the Purchaser, whose<br />

approval in writing <strong>of</strong> all changes shall be obtained before the closures are<br />

manufactured.<br />

10.3 Within four weeks from the approval date, Manufacturer shall submit one reproducible<br />

and six copies <strong>of</strong> Approved drawings, documents and specifications listed in clause 10.2<br />

<strong>of</strong> this specification.<br />

10.4 Prior to shipment, the Manufacturer shall submit one reproducible and six copies <strong>of</strong> the<br />

following :-<br />

a) Test certificates as listed in clause 6.0 <strong>of</strong> this specification.<br />

b) Manual for installation, erection instructions, maintenance and operation<br />

instructions.<br />

10.5 All documents shall be in English Language only.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!