MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

Document6<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE MAINLINE CONSTRUCTION<br />

(ONSHORE)<br />

- Realigning markers, signs<br />

STANDARD SPECIFICATION<br />

- Leak/burst <strong>of</strong> pipe, leaking flanges, washouts<br />

- Short-circuit in casings<br />

SPECIFICATION NO. PAGE 53 OF 53<br />

MEC/S/05/62/01 REVISION A<br />

- Construction defects such as dents, ovality, welding <strong>of</strong>fsets/defects, etc.<br />

detected during intelligent pigging survey.<br />

- etc.<br />

Company reserves the right to have the required Computerised Potential<br />

Logging Test executed during the DEFECTS LIABILITY PERIOD and whenever<br />

conditions are more favorable for this job. The work shall at or as soon as<br />

practicable after the expiration <strong>of</strong> the Defects Liability Period be delivered to<br />

COMPANY in the conditions required by the CONTRACT, fair wear and tear<br />

excepted, to the satisfaction <strong>of</strong> COMPANY. CONTRACTOR shall finish the<br />

work, if any outstanding, at the date <strong>of</strong> completion as soon as possible after<br />

such date and shall execute all such work.