MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE WELDING OF ONSHORE GAS<br />

SPECIFICATION NO. PAGE 33 OF 48<br />

PIPELINES<br />

MEC/S/05/62/02 REVISION<br />

16.3.13 COMPANY shall have free access to all the CONTRACTOR's work facilities in<br />

the field.<br />

16.3.14 Any approval granted by the COMPANY shall not relieve the CONTRACTOR <strong>of</strong><br />

his responsibilities and guarantees.<br />

16.4 Radiation Source<br />

16.4.1 Radiographic examination shall be carried out using x-radiations, Radiographic<br />

examination by Gamma rays may be allowed, at the discretion <strong>of</strong> the<br />

COMPANY, in case <strong>of</strong> inaccessible joints. Radiography by Gamma-Ray for tie-in<br />

joints shall be acceptable provided Du AGFA film or equivalent is used and the<br />

reqd. sensitivity obtained. Radiography by Gamma-Ray for tie-in-joints shall be<br />

acceptable provided D4 AGFA film or equivalent is used and the required<br />

sensitivity obtained.<br />

16.4.2 Whenever possible, pipeline welds will be inspected by placing the radiation<br />

source inside the pipe, on the pipeline axis, with a radiation <strong>of</strong> 6.28 rad. (360°C).<br />

If it is impossible to place the radiation source inside the pipe, the weld will be<br />

inspected with the source on the outside. An overlap <strong>of</strong> at least 40mm at the<br />

ends <strong>of</strong> each film shall be required to ensure that the first and last location<br />

increment numbers are common to successive films and to establish that no part<br />

<strong>of</strong> a weld has been omitted.<br />

16.5 Level <strong>of</strong> Quality<br />

The quality level <strong>of</strong> Radiographic sensitivity required for radiographic inspection<br />

shall be at least equivalent to the values in Fig. 6<br />

16.6 Penetrameters<br />

The image quality indicator (abbreviation : IQI) shall be used for the qualification<br />

<strong>of</strong> the welding procedure and during normal line production. Radiographic<br />

sensitivity shall be measured with the wire image quality indicator<br />

(Penetrameter). The penetrameter shall be selected according to DIN54109 ro<br />

ISO1027. For radiographs made with the source on the outside, a penetrameter<br />

shall be placed on each side <strong>of</strong> the film with the smaller wiere <strong>of</strong> the<br />

penetrameter turned towards the end <strong>of</strong> the film itself. When a complete weld is<br />

radiographed in a single exposure using a source inside the piping, four<br />

penetrameter approximately equally spaced around the circumference shall be<br />

used. During the procedure qualification, IQI shall be placed both on the source<br />

side and on the film side. The sensitivity obtained with IQI on the source side<br />

shall not be less than the values shown in Fig. 6 <strong>of</strong> this specification.<br />