MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

c:\fateh\standard\stad-eqp.wp<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE Hydrostatic Testing <strong>of</strong> Onshore Cross- SPECIFICATION NO. PAGE 17 OF 17<br />

country Pipelines<br />

MEC/S/05/62/03 REVISION A<br />

13.5 Once dewatering is over, the sectionalizing valves and other valve assemblies tested<br />

previously, shall be installed at locations shown in the drawings and in accordance with<br />

the procedures contained in the relevant specifications. All thermocouple installed in<br />

the pipeline shall be removed and damaged corrosion coating shall be repaired using<br />

COMPANY approved materials and procedure.<br />

14.0 PRESERVATION OF PIPELINE<br />

When so stated in the CONTRACT, to preserve/conserve the pipeline for a specified<br />

duration, CONTRACTOR shall completely fill the pipeline with water, with sufficient<br />

quantity <strong>of</strong> corrosion inhibitors depending upon quality <strong>of</strong> water and the period <strong>of</strong><br />

conservation, at a pressure to be agreed upon with the COMPANY at a later stage.<br />

CONTRACTOR shall obtain necessary approval from the COMPANY <strong>of</strong> the procedure<br />

and the type and quantity <strong>of</strong> the inhibitors used before commencement <strong>of</strong> the works.