04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MECON LIMITED<br />

REGD. OFF: RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE PIPING FABRICATION AND<br />

ERECTION<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 28 OF 62<br />

MEC/S/05/62/06 REVISION 0<br />

ELECTRODE QUALIFICATIONS TEST RECORD<br />

A : Tested at Date :<br />

(Site Name)<br />

Manufacturer's Name :<br />

Brand Name :<br />

Batch Number & size Tested :<br />

Classification & Code :<br />

Intended for Welding in positions :<br />

In combination with (if any) :<br />

Code <strong>of</strong> Reference (used for testing) :<br />

Special requirements (if any) :<br />

B : All - Weld Tensile Test<br />

Base Material used :<br />

Pre-heat temperature :<br />

Postweld Heat Treatment Details :<br />

Visual Examination :<br />

Radiographic Examination Results :<br />

Test Period :<br />

ANNEXURE-A<br />

Sheet 1 <strong>of</strong> 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!