MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION FOR<br />

PERMANENT CATHODIC<br />

PROTECTION SYSTEM<br />

TECHNICAL SPECIFICATION NO. : MEC/TS/05/62/016B REV-1 Page 7 <strong>of</strong> 24<br />

The detailed specification <strong>of</strong> each system and equipment shall be furnished by the<br />

CONTRACTOR. However, certain minimum requirements for the major equipment are<br />

highlighted in this document.<br />

All equipment shall be new and procured from approved reputed manufacturers.<br />

Equipment <strong>of</strong>fered shall be filed proven. Equipment requiring specialised maintenance<br />

or operation shall be avoided as far as possible. Protytype equipment shall not be<br />

accepted. Make and construction <strong>of</strong> all materials shall be subject to owner’s approval.<br />

As far as possible, equipment including test stations, anode lead junction boxes etc.<br />

shall be located in safe non-hazardous areas. However, all equipment to be installed in<br />

hazardous areas shall be <strong>of</strong> flamepro<strong>of</strong> type confirming to IS:2148 and suitable for gas<br />

groups <strong>II</strong>A & <strong>II</strong>B and temperature class – T3.<br />

7.1 Cathodic Protection Stations<br />

The number and exact locations <strong>of</strong> CP stations shall be worked out based on the<br />

corrosion survey data collected. In addition, the following guidelines shall be followed<br />

for selecting the locations.<br />

i) Number <strong>of</strong> CP stations and their selected location shall ensure that these<br />

remain valid and are adequate for the full design life <strong>of</strong> the system after<br />

considering all foreseeable factors.<br />

ii) As far as possible, the availability <strong>of</strong> nearly low resistivity areas for location <strong>of</strong><br />

associated ground beds must be ensured while selecting the locations <strong>of</strong> CP<br />

stations.<br />

iii) As far as possible, locations <strong>of</strong> intermediate CP stations shall co-incide with the<br />

locations <strong>of</strong> SV stations.<br />

The proposed locations <strong>of</strong> CP stations are detailed in project specifications. The same<br />

shall be verified for adequacy by the contractor and any additional requirements shall<br />

be clearly brought out at the bidding stage itself.<br />

7.2 Transformer Rectifier Unit/ CPSSM<br />

7.2.1 Cathodic protection transformer rectifier unit (T/R Unit) working on controlled<br />

rectification principle shall supply power for cathodic protection system. The T/R unit<br />

shall be provided at CP stations where reliable power supply is available and specified<br />

in project Specification.<br />

The T/R unit shall be filed proven. The design, internal component quality, ratings and<br />

layout <strong>of</strong> components shall ensure high MTBF and low MTTR.<br />

The T/R unit shall conform to MECON’s specification no MEC/TS/05/62/072 and T/R<br />

unit data sheet.<br />

D:\old data\FATEH\MP Region\Kailaras\Tender RFQ\TCP&PCP\Permanent Cathodic Proection - 016B-R1.doc