04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE WELDING OF ONSHORE GAS<br />

SPECIFICATION NO. PAGE 36 OF 48<br />

PIPELINES<br />

MEC/S/05/62/02 REVISION<br />

16.12 Equipment and Accessories<br />

16.12.1 CONTRACTOR shall make necessary arrangement at his own expense, for<br />

providing the radiographic equipment, radiographic film and all the accessories<br />

for carrying out the radiographic examination for satisfactory and timely<br />

completion <strong>of</strong> the job.<br />

16.12.2 For carrying out the mainline radiographic examination the CONTRACTOR shall<br />

be equipped with suitable mobile/ stationary type dark rooms.<br />

These shall have all the required facilities for film processing. Film viewer used<br />

shall be equipped with the film illuminator that has a light source <strong>of</strong> sufficient<br />

intensity and suitably controlled to allow viewing film densities upto 4.0 without<br />

damaging the film.<br />

16.13 Radiation Protection<br />

16.13.1 CONTRACTOR shall be responsible for the protection and personnel monitoring<br />

<strong>of</strong> personnel with or near radiation sources.<br />

16.13.2 The protection and monitoring shall comply with local regulations.<br />

16.13.3 In view <strong>of</strong> visual hazards in the handling <strong>of</strong> Radioactive source <strong>of</strong> material,<br />

CONTRACTOR shall be solely responsible for complying with all rules and<br />

regulations set forth by Atomic Energy Commission or any other Government<br />

agency <strong>of</strong> India in this regard and COMPANY shall not be responsible and shall<br />

be kept indemnified by the CONTRACTOR for default (s) <strong>of</strong> whatever nature by<br />

the CONTRACTOR. Safety equipment as considered adequate by the<br />

COMPANY for all necessary personnel shall be made available for use and<br />

maintained for immediate and proper use by the CONTRACTOR.<br />

16.14 Display <strong>of</strong> Safety Instructions<br />

16.14.1 The safety provisions shall be brought to the notice <strong>of</strong> all concerned by display on<br />

a notice board at a prominent place at the work spot. The person responsible for<br />

the "safety" shall be named by the CONTRACTOR.<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\02A welding onshore gas pipeline\Welding <strong>of</strong> Onshore Gas Pipelines with addendum - I 02A.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!