MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION FOR<br />

TEMPORARY CATHODIC<br />

PROTECTION SYSTEM<br />

TECHNICAL SPECIFICATION NO. : MEC/TS/05/62/016A REV-1 Page 18 <strong>of</strong> 19<br />

d. Operation/Maintenance manual,<br />

vendor data 6<br />

13.2 Contract drawings and documents<br />

13.2.1 As a part <strong>of</strong> the contract, drawings and documents shall be furnished which shall<br />

include but not be limited to the following:<br />

a. Report on corrosion survey<br />

b. Basis <strong>of</strong> system design calculations, equipment selection criteria and sizing<br />

calculations.<br />

c. Bill <strong>of</strong> material, material requisitions, purchase requisitions<br />

13.2.2 Detailed construction drawings (including as built drawings)<br />

a. Sacrificial anode fabrication drawings<br />

b. Typical layout drawing for anode ground bed installation and connection<br />

c. Equipment layout, cable layout and schedules<br />

d. Fabrication, installation and connection scheme drawing for different types <strong>of</strong><br />

test stations.<br />

e. Fabrication and installation details <strong>of</strong> surge diverter, grounding cell and<br />

polarisation cell with its enclosure and housing<br />

f. Cable-to-pipe joint details for charged and non-charged pipelines.<br />

g. Incorporation <strong>of</strong> anode beds, polarisation cell, surge diverters, test stations,<br />

etc., and other relevant features <strong>of</strong> CP system design in Pipeline alignment<br />

sheet and other related drawings<br />

h. Identification <strong>of</strong> section <strong>of</strong> pipeline affected by interference, source <strong>of</strong><br />

interference and details <strong>of</strong> interference mitigation arrangements provided.<br />

various measurement data at all relevant test stations with and without<br />

mitigation measures provided.<br />

i. Detailed commissioning report including various measurement data at all test<br />

stations, etc.<br />

j. Vendor drawings and catalogues, test certificates<br />

k. Operation and maintenance manual<br />

l. Miscellaneous<br />

- Equipment inspection and testing procedure<br />

- Construction, installation procedures<br />

- Field testing and commissioning procedures<br />

- Procedure for monitoring <strong>of</strong> cathodic protection after commissioning<br />

- Quality control procedures<br />

D:\old data\FATEH\MP Region\Kailaras\Tender RFQ\TCP&PCP\Temporary Cathodic Protection - 016A-R1.doc