04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION FOR<br />

TEMPORARY CATHODIC<br />

PROTECTION SYSTEM<br />

TECHNICAL SPECIFICATION NO. : MEC/TS/05/62/016A REV-1 Page 17 <strong>of</strong> 19<br />

to the pipeline then investigation shall be made for current discharge points on both<br />

the pipelines.<br />

Mitigation measured shall be provided depending on type <strong>of</strong> interference. These shall<br />

include installation <strong>of</strong> bond with variable resistor and diodes, installation <strong>of</strong> galvanic<br />

anodes for auxiliary drainage <strong>of</strong> current, adjustment/relocation (if possible) <strong>of</strong><br />

<strong>of</strong>fending interference source, provision <strong>of</strong> electric shield etc., depending on the type<br />

<strong>of</strong> interference.<br />

Bonding with foreign pipeline/structure as a mitigation measure shall be provided<br />

where the owner <strong>of</strong> the pipeline/structure has no objection, otherwise, alternative<br />

mitigation measure shall be provided. Where bonding is provided for mitigation the<br />

bonding resistor shall be adjusted for optimum value for minimum/no interference.<br />

Galvanic anodes installed as a mitigation measure shall be sized for the life specified<br />

for permanent CP.<br />

12.0 SYSTEM MONITORING<br />

The temporary CP system provided shall be monitored at all the test stations once in a<br />

month for healthiness/adequacy <strong>of</strong> protection till commissioning <strong>of</strong> permanent CP or<br />

for design life <strong>of</strong> temporary CP specified, whichever is less. During this period if any<br />

deficiency/interference in protection system is noticed the same shall be<br />

rectified/augmented by additional anodes as required. The monitoring report shall be<br />

submitted regularly to owner for his review/information.<br />

13.0 DRAWINGS AND DOCUMENTS<br />

13.1 General<br />

13.1.1 Within three weeks from the date <strong>of</strong> issue <strong>of</strong> PURCHASE ORDER, CONTRACTOR shall<br />

submit four copies <strong>of</strong> the list <strong>of</strong> all drawings/ data/ manuals/ procedures for approval,<br />

identifying each by a number and descriptive title and giving the schedule date. This<br />

list shall be revised and extended, as necessary, during the progress <strong>of</strong> work<br />

13.1.2 All drawings and documents shall be in English and shall follow metric system. Number<br />

<strong>of</strong> copies <strong>of</strong> each submission shall be as follows unless otherwise specified.<br />

Submission No. <strong>of</strong> Copies<br />

a. For review/approval 6<br />

b. Drawings issued for execution<br />

construction 6<br />

c. Final / As built drawings<br />

execution/construction 6<br />

D:\old data\FATEH\MP Region\Kailaras\Tender RFQ\TCP&PCP\Temporary Cathodic Protection - 016A-R1.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!