MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

Document6<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE MAINLINE CONSTRUCTION<br />

(ONSHORE)<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 35 OF 53<br />

MEC/S/05/62/01 REVISION A<br />

9.2.5 Moving supports, if any, shall be centered on their support and allow for a<br />

movement <strong>of</strong> at least 300mm in both directions.<br />

9.2.6 A comprehensive report/method statement on the laying operation to be used<br />

shall be submitted to the COMPANY well in advance for approval. The report as<br />

a minimum shall include, but not limited to the following:<br />

(a) Method <strong>of</strong> installation by lifting (as a preferred method).<br />

(b) Pulling method and related calculations, whenever lifting method cannot<br />

be used.<br />

(c) Pulling device and its characteristics<br />

(d) Method <strong>of</strong> anchoring the pulling device<br />

(e) Characteristics <strong>of</strong> the pulling rope<br />

(f) Braking device, if any<br />

(g) Pipeline assembly systems.<br />

10.0 BACK-FILLING<br />

10.1 Backfilling shall not be done until the pipe and appurtenances have the proper fit<br />

and the pipe is following the ditch pr<strong>of</strong>ile at the required depth that will provide<br />

the required cover and has a bed which is free <strong>of</strong> extraneous material and which<br />

allows the pipe to rest smoothly and evenly. Before any such work is done, it<br />

shall be the CONTRACTOR's responsibility to first secure the approval <strong>of</strong><br />

COMPANY. If any backfilling is done without COMPANY's approval, COMPANY<br />

will have the right to require removal <strong>of</strong> the backfill for examination, and the cost<br />

<strong>of</strong> such uncovering and refilling shall be borne by CONTRACTOR. Backfilling <strong>of</strong><br />

trench in water courses shall be carried out as per the relevant specifications<br />

issued for the purpose.<br />

10.2 Backfilling shall be carried out immediately after the pipeline has been laid in the<br />

trench, inspected and approved by the COMPANY, so as to provide a natural<br />

anchorage for the pipeline, thus avoiding long exposure <strong>of</strong> coating to high<br />

temperature, damaging actions <strong>of</strong> adverse weather conditions, sliding down<br />

<strong>of</strong> trench sides and pipe movement in the trench. If immediate back filling is<br />

not possible, a covering <strong>of</strong> atleast 200mm <strong>of</strong> earth, free <strong>of</strong> rock and hard lumps<br />

shall be placed over and around the pipe and coating.