MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE QUALITY ASSURANCE SYSTEMS SPECIFICATION NO. PAGE 5 OF 9<br />

REQUIREMENTS MEC/S/05/62/66 REVISION 0<br />

After award <strong>of</strong> work, the bidder may review augmentation <strong>of</strong> manpower and<br />

resources deployment chart (submitted earlier), detail it out, if so consented<br />

by MECON/ Owner and resubmit the same as “issued for effective<br />

implementation <strong>of</strong> the project”.<br />

4.2 The bidder shall plan the contract scope <strong>of</strong> work on quality plan format such<br />

that no major variation is expected during delivery <strong>of</strong> contract scope <strong>of</strong> work.<br />

These quality plan shall be made on enclosed format complete in all respect.<br />

The quality plan shall be assumed to be detailing bidder’s understanding and<br />

planning for the contract/ <strong>of</strong>fered scope <strong>of</strong> work. The bidder shall plan the<br />

type <strong>of</strong> resources including various work methodology which he agrees to<br />

utilize for delivery <strong>of</strong> contract scope <strong>of</strong> work.<br />

4.3 The bidder is required to review the contract at all appropriate stages to<br />

evaluate his capabilities with respect to timely and quality completion <strong>of</strong> all<br />

activities pertaining to contracted scope <strong>of</strong> work and shall report for<br />

constraints, if any to MECON/ Owner.<br />

4.4 The design activities, if any, performed during delivery <strong>of</strong> contract scope <strong>of</strong><br />

work shall be so controlled that the outputs is reliable enough. It is expected<br />

that during development <strong>of</strong> design, the bidder shall take recourse to detailed<br />

checking, inter departmental reviews and documented verification methods.<br />

4.5 For all documents which the bidder is likely to utilise for delivery <strong>of</strong> contract<br />

scope <strong>of</strong> work, a system must exist which assures that latest/ required<br />

version(s) <strong>of</strong> the document(s) is available at all location/ point <strong>of</strong> use.<br />

4.6 In case the bidder decides to sub-contract any part/ full <strong>of</strong> the contract scope<br />

<strong>of</strong> work (without prejudice to main Contractual condition), the bidder shall :<br />

• Evaluate the technical and financial capabilities and past performance <strong>of</strong><br />

the sub-contractor(s) and their products and/ or services before<br />

awarding them with the sub-contracted scope <strong>of</strong> work. Selection <strong>of</strong> a<br />

sub-contractor should meet MECON approval in documented form.<br />

• Requirement <strong>of</strong> this specification shall be enforced on sub-contracted<br />

agency also. The bidder shall choose sub-contractor based on their<br />

capability to meet requirements <strong>of</strong> this specification also.<br />