MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION FOR<br />

PERMANENT CATHODIC<br />

PROTECTION SYSTEM<br />

TECHNICAL SPECIFICATION NO. : MEC/TS/05/62/016B REV-1 Page 6 <strong>of</strong> 24<br />

5.15 Coating Resistance : 10,000 ohm/m 2 for normal soil<br />

4,500 ohm/m 2 for marshy area<br />

15,000 ohm/m 2 for high resistvity area<br />

5.16 Steel resistivity : 2.2 x 10 -5 ohm-m<br />

5.17 Cathode Polarisation at Drainage Point<br />

(Off Potential)<br />

5.18 Cathode Polarisation at farthest Point<br />

(Off Potential)<br />

D:\old data\FATEH\MP Region\Kailaras\Tender RFQ\TCP&PCP\Permanent Cathodic Proection - 016B-R1.doc<br />

: (-) 1.25 V (max.)<br />

: (-) 0.95V (min)<br />

5.19 Pipeline Natural Potential : (-) 0.45 V<br />

6.0 CATHODIC PROTECTION DESIGN CRITERIA<br />

Cathodic protection system shall be designed to meet the following criteria:<br />

i) The pipe to soil potential measurements shall be between (-) 0.95 V (Off)<br />

(-) 1.25 V (Off) with respect to a copper/ copper sulphate reference electrode<br />

using current interrupter installed in power supply line.<br />

ii) In rare circumstances, a minimum polarisation shift <strong>of</strong> (-) 100 millivolts may be<br />

accepted as an adequate level <strong>of</strong> cathodic protection for the pipeline with the<br />

written approval <strong>of</strong> owner.<br />

Discretion to use any <strong>of</strong> the criteria listed above shall solely rest with the<br />

owner/ owner’s representative.<br />

iii) A positive potential swing <strong>of</strong> 50 to 100 millivolts shall be considered as<br />

sufficient to indicate the presence <strong>of</strong> an interaction situation requiring<br />

investigation and incorporation <strong>of</strong> mitigation measures by the CONTRACTOR.<br />

7.0 SYSTEM DETAILS<br />

The system shall include the following major equipment / sub-system unless otherwise<br />

specified in project specifications :<br />

- CP stations<br />

- TR units/ cathodic protection power supply modules (CPPSM).<br />

- Anode ground beds and anodes.<br />

- Anode lead junction box.<br />

- Test stations.<br />

- Permanent reference cells.<br />

- Electrical resistance probes.<br />

- Polarisation cell/ surge divertor/ grounding cell/ spark gap arrester<br />

- CP system at cased crossing.<br />

- Cables.