8.13.4 The CONTRACTOR shall check that the concentration for the chemical pretreatment<br />

solution remains within the range recommended by the chemical<br />

manufacturer for the pipe coating process. The concentration shall be checked at<br />

the make up <strong>of</strong> each fresh solution and once per hour, using a method approved<br />

by the chemical manufacturer. The CONTRACTOR shall also ensure that the<br />

chemical pre-treatment solution remains free from contamination at all times.<br />

Recycling <strong>of</strong> chemical pre-treatment solution is not permitted.<br />

8.13.5 The CONTRACTOR shall ensure that the temperature <strong>of</strong> the substrate is<br />

maintained between 40°C and 80°C and the chromate solution temperature does<br />

not exceed 60° or as recommended by the manufacturer.<br />

8.13.6 The chromate coating shall be smooth, even, free from runs, drips or excessive<br />

application and lightly adherent with no flaking <strong>of</strong> the coating. The chromate<br />

coated steel must be thoroughly dried immediately after application and shall be<br />

achieved by boiling <strong>of</strong>f any residual solution on the surface.<br />

8.14 The total allowable elapsed time between completion <strong>of</strong> the blasting operations<br />

and commencement <strong>of</strong> the pre-coating and heating operations shall be such that<br />

no detectable oxidation <strong>of</strong> the surface occurs. Relative humidity readings shall<br />

be recorded every half on hour during the blasting operations in the immediate<br />

vicinity <strong>of</strong> the operations. The maximum elapsed time shall not exceed the<br />

duration given below :<br />

Relative Humidity % Maximum elapsed time<br />

> 80 2 hours<br />

70 to 80 3 hours<br />

< 70 4 hours<br />

Any pipe not processed within the above time-humidity requirement shall be<br />

completely re-blasted. Any pipe showing flash rusting shall be re-blasted even if<br />

the above conditions have not been exceeded.<br />

8.15 Pipe handling between abrasive blasting and pipe coating shall not damage the<br />

surface pr<strong>of</strong>ile achieved during blasting. Any pipe affected by the damage to the<br />

surface exceeding 200mm 2 in area/ or having contamination <strong>of</strong> steel surface shall<br />

be rejected and sent for re-blasting.<br />

9.0 COATING APPLICATION<br />

The external surface <strong>of</strong> the cleaned pipe conforming to clause 8.0 <strong>of</strong> this<br />

specification shall be immediately coated with 3-layer extruded polyethylene<br />

coating in accordance with the procedures approved by COMPANY, relevant<br />

standards and this specification. In general, the procedure shall be as follows :<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\14 3-layer pe coated line pipe\3-LPE Coating <strong>of</strong> Linepipes-TS-R2 14.doc Page 19 <strong>of</strong> 35