MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION<br />

FOR<br />

PIPELINE CROSSINGS USING<br />

HORIZONTAL DIRECTIONAL<br />

DRILLING METHOD<br />

TECHNICAL SPECIFICATION NO. : MEC/S/05/62/75 REV-0 Page 2 <strong>of</strong> 11<br />

1.0 SCOPE<br />

1.1 This specification covers the minimum requirements for various activities to be<br />

carried out by the Contractor for the engineering and construction <strong>of</strong> pipeline<br />

crossing using directional drilling method.<br />

1.2 This specification shall be read in conjunction with the requirements <strong>of</strong><br />

specification and other documents included in the CONTRACT between owner<br />

and Contractor.<br />

1.3 Contractor shall, execute the work in compliance with laws, by laws, ordinance<br />

and regulations. Contractor shall provide all services, labour, inclusive <strong>of</strong><br />

supervision there<strong>of</strong>, supply <strong>of</strong> all materials (excluding “Owner supplied<br />

Material), equipment , appliances etc..<br />

1.4 Contractor shall take full responsibility for the stability and safety <strong>of</strong> all<br />

operation and methods involved in the work.<br />

1.5 Contractor shall be deemed to have inspected and examined the work area<br />

and its surroundings and to have satisfied himself as far as practicable with the<br />

surface conditions, hydrological and climatic conditions, the extent and nature<br />

<strong>of</strong> the work and materials necessary for the completion <strong>of</strong> the work, and the<br />

means <strong>of</strong> access to the work area.<br />

1.6 Contractor shall be deemed to have obtained all necessary information with<br />

regard to risks, contingencies and all other circumstances, which may influence<br />

the work.<br />

1.7 Contractor shall, in connection with the work, provide and maintain at his own<br />

costs all lights, guards, fencing, as necessary or directed by Owner or their<br />

representative.<br />

1.8 For the purpose <strong>of</strong> this specification, the following definitions shall hold.<br />

- The words `Shall’ and `Must’ are mandatory.<br />

- The words `Should, May and Will’ are non mandatory, advisory, or<br />

recommendatory.<br />

1.9 Contractor shall provide free <strong>of</strong> charge reasonable facilities to Owner’s<br />

personnel to witness all stages <strong>of</strong> construction.<br />