MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

Document6<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE MAINLINE CONSTRUCTION<br />

(ONSHORE)<br />

1.0 SCOPE<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 2 OF 53<br />

MEC/S/05/62/01 REVISION A<br />

1.1 This specification covers the minimum requirements for the various activities to<br />

be carried out by CONTRACTOR for or about the construction <strong>of</strong> cross-country<br />

pipelines.<br />

1.2 The various activities covered in this specification include the following works <strong>of</strong><br />

pipeline construction :<br />

Clearing, grubbing and grading <strong>of</strong> Right-<strong>of</strong>-way<br />

Construction <strong>of</strong> all temporary facilities required in connection with the<br />

WORKS<br />

Staking <strong>of</strong> the pipeline route<br />

Handling, hauling, stringing and storing <strong>of</strong> all materials<br />

Trenching<br />

Field-bending <strong>of</strong> line pipe<br />

Lining-up<br />

Pipeline laying<br />

Backfilling<br />

Tieing-in<br />

Installation <strong>of</strong> auxiliary facilities and appurtenances forming a part <strong>of</strong><br />

pipeline installation<br />

Clean-up and restoration <strong>of</strong> Right-<strong>of</strong>-way;<br />

Maintenance during defects liability period.