MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

c:\fateh\standard\stad-eqp.wp<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE Hydrostatic Testing <strong>of</strong> Onshore Cross- SPECIFICATION NO. PAGE 10 OF 17<br />

country Pipelines<br />

MEC/S/05/62/03 REVISION A<br />

Bleed-<strong>of</strong>f water shall be accurately measured and recorded.<br />

8.0 ACCEPTANCE<br />

8.1 The hydrostatic test shall be considered as passed if pressure has kept a constant<br />

value throughout the test duration, except for change due to temperature effects. Such<br />

change shall be evaluated as described under clause 12.2 <strong>of</strong> this specification.<br />

The pressure change value as a function <strong>of</strong> temperature change shall be algebraically<br />

added to the pressure value as read on the meters. The pressure value thus adjusted<br />

shall be compared with the initial value and the test shall be considered as acceptable<br />

if the difference is less than or equal to 0.3 bar. In case <strong>of</strong> doubt the testing period shall<br />

be extended by 24 hours.<br />

8.2 If test section fails to maintain the specified test pressure after isolation,<br />

CONTRACTOR shall determine by search the location <strong>of</strong> leakage or failure. All leaks<br />

and failures within the pipe wall or weld seam shall be repaired by replacement <strong>of</strong> entire<br />

joint or joints in which leakage or failure occurs. In circumferential welds the method <strong>of</strong><br />

repair shall be determined by the COMPANY. CONTRACTOR shall comply with<br />

instructions <strong>of</strong> the COMPANY whether to replace a section <strong>of</strong> the line pipe that<br />

includes the line leak or whether to repair the circumferential weld. This repair should<br />

however meet the requirements <strong>of</strong> 'Specification for Welding Pipelines and Related<br />

Facilities'. Where failure occur in pipeline field bends, bends shall be replaced with<br />

same degree <strong>of</strong> bends. After completion <strong>of</strong> repairs, the hydrostatic test shall be<br />

repeated in full, as per this specification.<br />

8.3 The cost <strong>of</strong> repairs or replacements, followed by refilling and repressurizing the line,<br />

due to poor workmanship, shall be borne by the CONTRACTOR. In the event <strong>of</strong> leaks<br />

or failures resulting form faulty COMPANY furnished materials, CONTRACTOR shall<br />

be reimbursed for furnishing all labour, equipment, materials, except those materials<br />

furnished by the COMPANY, and transportation necessary to repair and repressurize<br />

the section <strong>of</strong> the pipeline to the pressure at the time <strong>of</strong> recognition <strong>of</strong> leak or line<br />

failure. CONTRACTOR shall be entitled for compensation as per the provisions <strong>of</strong> the<br />

CONTRACT. All work <strong>of</strong> reinstalling line pipe, to replace pipe failures shall be done in<br />

accordance with the relevant specification included in the CONTRACT.