STANDARD SPECIFICATION<br />

TITLE Hydrostatic Testing <strong>of</strong> Onshore Cross- SPECIFICATION NO. PAGE 4 OF 17<br />

country Pipelines<br />

MEC/S/05/62/03 REVISION A<br />

e) Procedures for levelling and stabilization after filling and for pressurization and to<br />

allow for temperature stabilization.<br />

f) Pressure testing procedure including a complete description <strong>of</strong> all proposed<br />

equipment and instruments (including spares), their location and set-up, and<br />

proposed system for observation and recording <strong>of</strong> data during the pressure test.<br />

g) Procedure for detection and location <strong>of</strong> leaks.<br />

h) Procedure for dewatering the pipeline section(s) after testing, including a<br />

complete description <strong>of</strong> all proposed equipment and instruments, (including<br />

spares), their location and set-up, the type and sequence <strong>of</strong> pigs and the pig<br />

tracking system along with the pig specifications.<br />

i) Forms for recording the test data.<br />

5.0 TEST DURATION AND PRESSURE<br />

5.1 The duration <strong>of</strong> hydrostatic test shall be a minimum <strong>of</strong> 24 hours after stabilization and<br />

the test pressure shall be as indicated in the approved hydrostatic test diagram.<br />

5.2 Unless specified otherwise in the CONTRACT, the maximum base pressure shall not<br />

be higher than the one resulting in a hoop stress corresponding to 90% <strong>of</strong> SMYS <strong>of</strong><br />

pipe material based on the minimum wall thickness in the test section and minimum<br />

test pressure shall not be lower than the one resulting in a hoop stress corresponding<br />

to 85% <strong>of</strong> SMYS <strong>of</strong> pipe material based on the minimum wall thickness in the test<br />

section.<br />

6.0 EQUIPMENT AND INSTRUMENTATION<br />

The CONTRACTOR shall furnish all necessary equipment for performing the work as<br />

stated in cleaning, flushing, filling, levelling, stabilizing, testing and dewatering<br />

procedures. This shall include the following :<br />

a) Pigs for filling , cleaning and gauging including<br />

- Cleaning pigs with spring loaded steel wire brushes except for internal coated<br />

pipes. In this case pigs to be provided with nylon / polyurethane brushes.<br />

- Four cup batching pigs<br />