MECON LIMITED<br />

REGD. OFF: RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\04A major water crossing\Major Water Crossing -Final 04.doc<br />

STANDARD SPECIFICATION<br />

TITLE MAJOR WATER CROSSINGS SPECIFICATION NO. PAGE 1 OF 14<br />

0.0 DEFINITION<br />

1.0 SCOPE<br />

2.0 GENERAL<br />

3.0 TRENCHING<br />

C O N T E N T S<br />

4.0 CONTINUOUS CONCRETE COATING<br />

5.0 HYDROSTATIC PRE-TESTING<br />

6.0 INSTALLATION<br />

7.0 BACKFILLING AND BANK PROTECTION<br />

8.0 FINAL HYDROSTATIC TEST<br />

9.0 POST-CONSTRUCTION SURVEY<br />

10.0 FINAL CLEAN-UP<br />

11.0 DOCUMENTATION<br />

MEC/S/05/62/04 REVISION 0<br />

PREPARED BY CHECKED BY APPROVED BY