04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE WELDING OF ONSHORE GAS<br />

SPECIFICATION NO. PAGE 42 OF 48<br />

PIPELINES<br />

MEC/S/05/62/02 REVISION<br />

Soaking Temp. °C :<br />

Soaking Time, Hrs. :<br />

Rate <strong>of</strong> Cooling, °C/ Hr. :<br />

Mode <strong>of</strong> Cooling :<br />

4. Other Details, if any.<br />

Notes :<br />

The following documents shall be furnished alongwith the specifications :<br />

i. Material Test Certificates<br />

ii. Assembly/ Part Drawing.<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\02A welding onshore gas pipeline\Welding <strong>of</strong> Onshore Gas Pipelines with addendum - I 02A.doc<br />

ANNEXURE-<strong>II</strong><br />

Sheet 2 <strong>of</strong> 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!