04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MECON LIMITED<br />

REGD. OFF RANCHI<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

INSULATING JOINTS<br />

TECHNICAL SPECIFICATION NO. : MEC/TS/05/62/009 REV-0 Page 10 <strong>of</strong> 10<br />

D:\TS\Insulating Joints - 09 - TS.doc<br />

c) Clausewise list <strong>of</strong> deviation from this specification, if any.<br />

9.3 Within three weeks <strong>of</strong> placement <strong>of</strong> order, the Manufacturer shall submit four<br />

copies <strong>of</strong> but not limited to the following drawings, documents and specifications<br />

for approval.<br />

a) Fabrication drawings and relevant calculations for pressure containing<br />

parts.<br />

b) Welding procedure and method <strong>of</strong> manufacture for all phases <strong>of</strong><br />

manufacture.<br />

c) Quality Assurance Plan (QAP)<br />

Once the approval has been given by purchaser any changes in design, material<br />

and method <strong>of</strong> manufacture shall be notified to the Purchaser whose approval in<br />

writing <strong>of</strong> all changes shall be obtained before the insulting joint are<br />

manufactured.<br />

9.4 Within four weeks from the approval date Manufacturer shall submit one<br />

reproducible and six copies <strong>of</strong> the approved drawings, documents and<br />

specifications as listed in 9.3 <strong>of</strong> this specification.<br />

9.5 Prior to shipment, the manufacturer shall submit one reproducible and six copies<br />

<strong>of</strong> the test certificates as listed in Clause 6.0 <strong>of</strong> this specification.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!