it would be in the interest <strong>of</strong> the manufacturer to ensure that both surface<br />

preparation and application are carried out as per their recommendations.<br />

21.9 Final inspection shall include measurement <strong>of</strong> paint dry film thickness.<br />

Adhesion Holiday detection check <strong>of</strong> finish and workmanship. The<br />

thickness should be measured at as many points/ locations as decided by<br />

Engineer-in-Charge and shall be within + 10% <strong>of</strong> the dry thickness,<br />

specified in the specifications.<br />

21.10 The contractor shall arrange for spot checking <strong>of</strong> paint materials for Sp.<br />

Gr., flow time (ford cup) and spreading rate.<br />

22.0 GUARANTEE<br />

22.1 The contractor shall guarantee that the chemical and physical properties<br />

<strong>of</strong> paint materials used are in accordance with the specifications contained<br />

herein/ to be provided during execution <strong>of</strong> work.<br />

22.2 The contractor shall produce test report from manufacturer regarding the<br />

quality <strong>of</strong> the particular batch <strong>of</strong> paint supplied. The Engineer-in-Charge<br />

shall have the right the test wet samples <strong>of</strong> paint at random, for quality <strong>of</strong><br />

same as stipulated in clause 11 above. Batch test report <strong>of</strong> manufacturer’s<br />

for each batch paint supplied shall be made available by the contractor.<br />

23.0 QUALIFICATION CRITERIA OF PAINTING CONTRACTOR<br />

Painting contractor who is awarded any job for EIL, projects under this<br />

standard must have necessary equipments, machinery, tool and tackles<br />

for surface preparation, paint application and inspection. The contractor<br />

must have qualified trained and experienced surface preparation, paint<br />

applicator, inspector, and supervisors. The contractor supervisor,<br />

inspector surface perpetrator and paint applicator must be conversant with<br />

the standards referred in this specification the contractors capacity,<br />

capability and competency requirements for the job shall be quantified in<br />

the tender document and shall be assessed by an EIL team before<br />

awarding any job.<br />

Page 40 <strong>of</strong> 49