MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

Document6<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE MAINLINE CONSTRUCTION<br />

(ONSHORE)<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 24 OF 53<br />

MEC/S/05/62/01 REVISION A<br />

Where the pipeline crosses areas, whose easements specifically require greater<br />

than normal depths <strong>of</strong> cover, the trench shall be excavated to extra depth in<br />

accordance with the Right-<strong>of</strong>-way Agreements or as required.<br />

CONTRACTOR shall excavate all such additional depths as may be necessary<br />

at no extra cost to the COMPANY.<br />

6.7 Grades, Bends and Finish <strong>of</strong> Trench<br />

6.8 Padding<br />

The trench is to be cut to a grade that will provide a firm, uniform and continuous<br />

support for the pipe. Bends shall be made in the pipe at significant changes in<br />

grade <strong>of</strong> the trench. COMPANY reserves the right to set the grade <strong>of</strong> the trench<br />

and locate the bends if so desired, in which case CONTRACTOR shall<br />

excavate, at no extra cost, the trench and bend the pipe to such a grade.<br />

COMPANY desires to reduce to a minimum the required number <strong>of</strong> cold field<br />

bends to lay the pipe to conform to the general contour <strong>of</strong> the ground and<br />

maintain a normal cover. This can be accomplished by cutting the trench slightly<br />

deeper at the crest <strong>of</strong> ridges and by gradually deepening the trench in<br />

aproaches to crossings. Such trenching work shall be done by CONTRACTOR<br />

at no extra cost to the COMPANY.<br />

COMPANY intends that there will be a minmum <strong>of</strong> hand grading <strong>of</strong> the trench<br />

bottom. However, to achieve this, CONTRACTOR will have to dig as square a<br />

bottom <strong>of</strong> the trench as possible with his equipment. This in part can be<br />

obtained by adjusting and adopting the crumbling shoe and digging teeth <strong>of</strong> the<br />

trenching machines and by use <strong>of</strong> a drag behind the trenching machines or<br />

manually dressing-up the same. CONTRACTOR shall do such hand work in the<br />

trench as is necessary to free the bottom <strong>of</strong> the trench from loose rock and hard<br />

clods and to trim protruding roots from the bottom and side walls <strong>of</strong> the trench.<br />

In all cases where rock or gravel or hard soil is encountered in the bottom <strong>of</strong> the<br />

trench, COMPANY will decide the exact extent <strong>of</strong> trench padding, that will be<br />

required. The thickness <strong>of</strong> the compacted padding shall not be less than<br />

150mm. In those areas that are to be padded, the trench shall be at least<br />

150mm deeper than otherwise required, and evenly and sufficiently padded to<br />

keep the pipe, when in place, at least 150mm above bottom <strong>of</strong> excavated trench.