04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.4 Qualification for Contractor’s supplied Materials and their<br />

Manufacturer<br />

3.4.1 Prior to procurement <strong>of</strong> coating materials, Contractor shall furnish the<br />

following information for qualification <strong>of</strong> the Manufacturer and material:<br />

a. Complete descriptive technical catalogs describing the materials<br />

<strong>of</strong>fered along with samples <strong>of</strong> corrosion coating materials, its<br />

properties and application instruction as applicable specifically to<br />

the project.<br />

b. Reference list <strong>of</strong> previous supplies, in last 5 years, <strong>of</strong> the similar<br />

material or manufacturer shall be notified to Company, whose<br />

approval in writing <strong>of</strong> all charges shall be obtained before the<br />

materials are manufactured.<br />

3.4.2 Contractor shall ensure that the coating materials supplied by him are<br />

properly packed and clearly marked with the following :-<br />

- Manufacturer’s name<br />

- Material Qualification Certificate Number<br />

- Batch Number<br />

- Date <strong>of</strong> Manufacturing and date <strong>of</strong> expiry<br />

3.4.3 Prior to shipment <strong>of</strong> materials from the Manufacturer’s Works. Contractor<br />

shall furnish the following documents:<br />

a. Test certificate/results as per Manufacturer’s Quality Control<br />

Procedure for each batch <strong>of</strong> materials complying with the<br />

requirements <strong>of</strong> relevant sub-clauses <strong>of</strong> clause no. 3.2 <strong>of</strong> the this<br />

specification.<br />

b. Specific application instructions with pictorial illustrations.<br />

c. Specific storage and handling instructions.<br />

3.4.4 All documents shall be in English language only.<br />

3.5 Storage <strong>of</strong> Materials<br />

Material shall be stored in sheltered storage by the Contractor in the<br />

manufacturer’s original packing and away from direct sunlight and in<br />

accordance with manufacturer’s instructions.<br />

4.0 APPLICATION PROCEDURE<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\74 field joint for HDD crossing\Specification for FPJ Coating for HDD Crossing - 074-f.doc Page 7 <strong>of</strong> 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!